90 Degree Brass Split Valve Air Conditioner Valve and AC Service Valve
90 Degree Brass Split Valve Air Conditioner Valve and AC Service Valve
The 90 - degree Brass Split - type Air - conditioner Valve is a key component in split - type air - conditioner systems (such as household and commercial air - conditioners) for controlling the flow of refrigerant. It is mainly used to connect the refrigeration pipelines of the indoor unit and the outdoor unit, achieving functions such as refrigerant on - off control, pressure detection, and system maintenance. Since its main body is made of brass and has a 90 - degree right - angle structure, it is called the "90 - degree Brass Split - type Air - conditioner Valve".
Advantages
1.High Reliability: The brass material is corrosion - resistant and can withstand high pressure, making it suitable for long - term and high - frequency use.
2.Convenient Installation: The 90 - degree structure is adaptable to various pipeline layouts, reducing on - site processing costs.
3.Multi - function Integration: It integrates on - off control and maintenance interfaces, reducing maintenance complexity.
Applications
1.Household/Commercial Split Air Conditioners: Commonly found in the connecting pipelines between the outdoor and indoor units of wall - mounted and cabinet air conditioners.
2.Central Air Conditioning Systems: Such valves are also used in the pipeline connections of some small and medium - sized central air conditioning outdoor units.
3.Refrigeration Equipment Maintenance Scenarios: It is an essential component in maintenance operations such as air conditioner relocation, refrigerant charging, and leak detection.
| Product name | Service Valve |
| Warranty | 1year |
| Application | Refrigeration Unit |
| MOQ | 50pc |
| Weight | 0.5kg |
1.Can I get a sample?
confirming that our samples are the products and quality you want, we will waive the sample fees for you.
2.Do you give any guarantee to your products ?
3. How long for delivery time after pay deposit?
2) For suspension product, it generally takes 20-25 days for production.
3) For engine prodcuts, it generally takes 30 days for production.
4.What are your advantages?
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

