77-1426 Pulley Water Pump Ymar For Thermo King TK 3.74 And TK 3.95 Refrigeration Units
Price:
Negotiate
MOQ:
1
Delivery Time:
3-5work day
Product Description
Pulley Water Pump 77-1426 771426 771-426 For Yanmar Thermo King TK 3.74 / 3.95
Product Description
The Pulley Water Pump 77-1426 (771426 / 771-426) is a precision-engineered pulley designed for use with the water pump assembly on Yanmar diesel engines used in Thermo King TK 3.74 and TK 3.95 refrigeration units.
This pulley ensures smooth power transmission from the drive belt to the water pump, enabling consistent coolant circulation and effective engine temperature control. Manufactured from high-strength steel with precision balancing, it delivers durable performance, low vibration, and long service life in demanding refrigeration environments.
It serves as a direct OEM replacement for Thermo King and Yanmar systems, ensuring perfect fitment and reliability.
Product Specifications
| Attribute | Description |
|---|---|
| Product Name | Water Pump Pulley / Coolant Pump Pulley |
| Part Numbers | 77-1426, 771426, 771-426 |
| Application | Truck & Trailer Refrigeration Units |
| Material | High-Strength Steel / Cast Iron (OEM Grade) |
| Surface Treatment | Anti-Corrosion Coating (Black Oxide or Painted) |
| Function | Transfers Drive Power to Water Pump |
| Outer Diameter | OEM Standard (Varies by Engine Type) |
| Number of Grooves | Single / Multi (Based on Model) |
| Condition | New (OEM-Quality Replacement) |
Frequently Asked Questions
Can I get a sample?
Of course! We are happy to provide you with samples, you only need to pay the sample fee and shipping fee, and then after confirming that our samples are the products and quality you want, we will waive the sample fees for you.
Do you give any guarantee to your products?
Yes, we have 18 months quality guarantee except for some fast moving parts (such as filters, spark plug etc).
How long for delivery time after pay deposit?
- For body parts product, it generally takes 15 days for production.
- For suspension product, it generally takes 20-25 days for production.
- For engine products, it generally takes 30 days for production.
What are your advantages?
Prompt reply and honest attitude. Delivery fast, Price advantage, Keep quality and do best service.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Guangzhou Kaida Refrigeration Technology Co., Ltd
Location
2603A Jinying Building, Huanshi Middle Road, Yuexiu District, Guangzhou City
Contact Person
Abbott