medical gloves stripping manufacturing equipment machine
Price:
$450,000.00 - $1,280,000.00/sets
MOQ:
Negotiable
Delivery Time:
Negotiable
Brand:
DEYI
Product Description
Products Description


surgical medical nitrile latex gloves stripping production line
The nitrile/latex glove production line uses natural latex or synthetic rubber as the main raw material and other chemicals as auxiliary materials. The hand mold is cleaned with acid and alkali, and then cleaned with water again. Then the cleaned hand mold is first immersed in hot water and heated then immersed into coagulant and dried for dipping. After dipping, go into an oven for preliminary drying, flushed with hot water and then sent to another oven for curing and drying to form. After the gloves are demolded, they are inflated or filled with water for inspection, washed.centrifuged. and dried before packaging and sending them to the finished product warehouse.
Our Advantage

3D Installation
DEYI company supplies 3D installation drawing, which makes the process of installation more intuitive and easier.

Formula available
DEYI company promises to take out the formula free to order’s client in order to cut clients’ cost, we make sure every client
produce nitrile or latex gloves steadily and efficiently.
produce nitrile or latex gloves steadily and efficiently.
Type of production line
TYPE | Hand mold | Capacity(pieces/hr) | Size | Power | Latex Consumption |
DY45 | single | 2400-3000 | 45x1.8x7m | About 75kw/h | About 0.7tons/day |
DY50 | single | 3000-3600 | 50x1.8x8m | About 80 kw/h | About 0.8tons/day |
DY80 | single | 8100-8500 | 80x1.8x8m | About 90 kw/h | About 1.8 tons/day |
DY100 | single | 9600-10200 | 100x1.8x8m | About 120 kw/h | About 2.5 tons/day |
DY110 | single | 29000-30500 | 110x1.8x12m | About 150 kw/h | About 6.6 tons/day |
DY120 | double | 19000-21000 | 120x1.8x11m | About 120 kw/h | About 4.4 tons/day |
DY140 | double | 15500-16500 | 140x1.8x8m | About 120 kw/h | About 3.5 tons/day |
DY180 | double | 35000-40000 | 180x1.8x12m | About 150 kw/h | About 8.2 tons/day |
Details Images






Installation Instructions





FAQ
Q1:How Long Is The Warranty Period?A1:one year,the after-sales is long life.
Q2: How About The Installation? Do You Have After-Sales Service?
A2: A:We will provide the installation video and manual.we also can send the professional technician to your company to install the machine and train your staff until they could operate the machine independently.
Q3: What Should We Prepare Except Material?
A3 You should prepare workshop, water line, electric line, compress air (if you need, we can help you buy air compressor). We can
supply workshop layout drawing according to your workshop.
Q4: How long is the delivery time?
A4 the delivery time is 90days, the client can choose the installment
Q2: How About The Installation? Do You Have After-Sales Service?
A2: A:We will provide the installation video and manual.we also can send the professional technician to your company to install the machine and train your staff until they could operate the machine independently.
Q3: What Should We Prepare Except Material?
A3 You should prepare workshop, water line, electric line, compress air (if you need, we can help you buy air compressor). We can
supply workshop layout drawing according to your workshop.
Q4: How long is the delivery time?
A4 the delivery time is 90days, the client can choose the installment
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Longkou Deyi Machinery Co., Ltd.