Single Phase Phantom Load
Price:
negotiate rates
MOQ:
1
Delivery Time:
1~4weeks
Brand:
GENY
Product Description
Single Phase Phantom Load
Wiring Diagram
Important Notice
Although the positions of the L(in), L(out), N(in), and N(out) terminals may vary across electricity meters, the wiring principle remains consistent:
- The line terminal (L) of the single phase phantom load connects to L(in) of the electricity meter
- The neutral terminal (N) of the single phase phantom load connects to N(in) of the electricity meter
- The current 20A/10A terminal of the single phase phantom load connects to L(out) of the electricity meter
Operation Instructions
The single phase phantom load provides calibrated current when user load is insufficient for electricity meter testing requirements.
- When user load is too low or zero to meet calibration requirements, connect the phantom load according to the wiring diagram
- For zero user load: After connecting the phantom load, the current clamp must clamp ONLY the phantom load current cable during error testing
- For low user load: The clamp must simultaneously clamp both the phantom load current cable and the original current cable connected to the electricity meter's L(out) terminals to avoid measurement errors
Safety Precautions
- Do not reverse-connect current output and neutral wires
- Never apply 380V between line and neutral wires
- Turn off the phantom load switch before performing on-site wiring
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Guangzhou GENY Electric Co., Ltd
Location
ROOM 107, 1ST FLOOR, No. 602 GUANGSHAN ER ROAD, TIANHE DISTRICT, GUANGZHOU, CHINA POSTCODE: 510663
Contact Person
John Shen