1.Separation of oily(including emulsified) wastewater from petroleum, chemical and mechanical processes.
2.Recovery of sewage organic matter.(such as recovery of pulp fibers and fillers from paper mill wastewater).
3.Treatment of wastewater with high chroma and low dissolved oxygen.Such as textile printing and dyeing wastewater treatment .
4.Treatment of oxide-rich wastewater containing algae.
5.Treatment of low temperature and low turbidity sewage.
6.Replace secondary sedimentation tank, suitable for the situation that is easy to produce sludge swelling;It is suitable for the concentration of residual activated sludge and convenient for the treatment of filter press.
Advanced Sliver Dissolved Air Flotation for Slaughter House Wastewater Purification
Price:
$6,599.00/pieces 1-1 pieces
MOQ:
1
Delivery Time:
Negotiable
Brand:
BETTER
Product Description
PRODUCT DESCRIPTION
YW series Dissolved Air Flotation is mainly for solid-liquid or liquid-liquid separation. Large sum of micro bubbles produced by dissolving and releasing system adhere to solid or liquid particles with same density as waste water to make the whole float to the surface thus achieve the aim of solid-liquid or liquid-liquid separation.



Features
(1) Large capacity, high efficiency and small occupying space. (2) Compact structure, easy operation and maintenance. (3) Silt expansion elimination.
Model | Capacity (m³/h) | Dissolved Gas water (m³/h) | Main dynamo power (KW) | Foam scraper power (KW) | Air compressor power (KW) | Dissolved air tank size (mm) | Overall dimension (mm) |
YW-5 | 4-5 | 1.5-2 | 3 | 0.55 | 1.5 | φ400×1000 | 3300×1800×2000 |
YW-10 | 8-10 | 2-3 | 4 | 0.55 | 1.5 | φ500×1512 | 4000×2100×2200 |
YW-20 | 15-20 | 5-7 | 7.5 | 0.55 | 1.5 | φ500×1512 | 4600×2400×2200 |
YW-30 | 20-30 | 6-10 | 7.5 | 0.55 | 1.5 | φ500×1512 | 5200×2600×2400 |
YW-40 | 30-40 | 8-13 | 7.5 | 0.75 | 2.2 | φ600×1880 | 6000×2600×2400 |
YW-50 | 40-50 | 15-20 | 7.5 | 0.75 | 2.2 | φ600×1880 | 7000×2600×2400 |
YW-60 | 50-60 | 18-27 | 11 | 0.75 | 2.2 | φ600×1880 | 7600×2800×2400 |
YW-70 | 60-70 | 22-30 | 11 | 0.75 | 2.2 | φ650×2034 | 8400×2800×2400 |
YW-80 | 70-80 | 24-32 | 11 | 0.75 | 3 | φ650×2034 | 9200×2800×2400 |
YW-105 | 90-105 | 30-35 | 15 | 1.5 | 3 | φ700×1980 | 10000×2800×2600 |
YW-150 | 125-150 | 60-80 | 22 | 1.1 | 4 | φ700×1980 | 13500×2800×2600 |
YW-200 | 175-200 | 80-100 | 30 | 1.1 | 5.5 | φ800×2100 | 15800×2800×2600 |
YW-250 | 225-250 | 100-120 | 37 | 1.1 | 5.5 | φ800×2400 | 15200×3400×2600 |
YW-300 | 280-300 | 120-180 | 37 | 1.1 | 5.5 | φ1000×2900 | 19200×3400×2800 |
APPLICATION

OUR SERVICE

Product Performance:
1.The DAF machine relies on a large number of micro-bubbles to remove the flocculation of the adhesion reaction,so the flocculation requirements are not high ,which can reduce the flocculation time and save the flocculation agent.
2.High yield per unit area,small pool capacity and floor area,saving land and cost.
3.Convenient sludge discharge ,low water consumption;low moisture content of sludge.
4.Shallow tank body depth ,simple tank structure .The machine can be opened and stopped at any time according to the situation and the actual needs , without affecting the water quality ,easy operation and maintenance.

RECOMMEND PRODUCT


PACKAGING AND TRANSPORTATION

ABOUT US


BUYER'S PRAISE

FAQ
Q: How to buy your incinerator?
A: You can provide us the waste kind and waste quantity(connect us for more details). we will recommand you the suitable model incinerator.
Q: What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 3 to 4 weeks.
Q: How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. And we will send a technician to guide for installation and debugging. After debugging equipment, he will teach your workers how to use it and how to maintain it.
A: You can provide us the waste kind and waste quantity(connect us for more details). we will recommand you the suitable model incinerator.
Q: How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
Q: What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 3 to 4 weeks.
Q: How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. And we will send a technician to guide for installation and debugging. After debugging equipment, he will teach your workers how to use it and how to maintain it.
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shandong Better Environmental Protection Technology Co., Ltd
Location
8358 Luhe Road, Weifang, Shandong, China
Contact Person
Christine Zhu