Heavy Duty Water Chiller for Industrial Concrete Cooling System 1000 KG Capacity


Point I
The unit adopts a semi-closed screw compressor. The compressor adopts a 5:6 asymmetric high-efficiency screw rotor, which is graded or steplessly energy regulated. It is automatically adjusted according to load changes and is more energy efficient.
The unit heat exchanger adopts high-efficiency heat exchange tube to improve the cooling efficiency. At the same time, in order to reduce the lubricating oil entering the heat exchanger, the unit increases the secondary oil content, minimizes the amount of oil entering the heat exchanger, and passes the specially designed ejector. The oil return device directs the lubricating oil in the heat exchanger back to the compressor to improve the refrigeration efficiency of the unit and also improve the reliability of the unit operation.


Point III
The unit is equipped with multiple protections to make the unit operate safely and reliably. The unit adopts a direct cooling
mode, which reduces the loss caused by the intermediate heat exchange and greatly reduces the running cost.
Environmentally friendly 134a refrigerant is used to improve unit operating efficiency. The unit is equipped with multiple
protections to make the unit safe and reliable.




Model | FWC |
Capacity | 1,000- 360,000 kgs/24 hours |
Measurement(mm) | Tailor Made |
Weight | As drawing |
Volume | As drawing |
Water Type | Country Water/ Ground Water/ Sea Water Optional |
Water Outlet Temperature | Min. 2c |





OUR SERVICE
1). Installing by the user: we will test and install the machine before shipment, all necessary spare parts, operation manual are provided to guide the installation.
2).Installing by FOCUSUN engineers:
* (1) We can send our engineer to assist the installation and provide technical support and train your workers. The end-user should provide accommodation and round-trip ticket for our engineer.
* (2) Before our engineers’ arrival, the installation place, electricity, water and installation tools should be prepared.
Meanwhile, we will provide you a Tool List with the machine when delivery.
* (3) All spare parts are provided according to our standard.
* (4) 2~ 3 workers are required to assist the installation for big project.

Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.