Beijing Qinrunze Environmental Protection Technology Co., Ltd.
                                                                                                           
Verified Supplier
17 Years
Since 2009
Menu

The Report Of The In-depth Environmental Impact Assessment Document Ensures The Smooth Passing Of The Environmental Impa

Price Negotiable
Price: ¥20000-¥40000
MOQ: 1
Delivery Time: 20-30 working days
Brand: QRZ
Product Description



Provide process technical support:
1. Includes basic information, design scale, water composition and discharge pattern, water quality of each stream, discharge requirements, and other requirements.
2. Including design standards, design principles, analysis of water quality and treatment characteristics, process comparison and determination of process routes (responsible for meeting the owner's requirements), detailed process flow diagrams and explanations, and a list of removal rates for each process unit.
3. Includes a list of structures and equipment for each unit.
4. General instructions for structure, architecture, electrical and self-control, material selection, anti-corrosion, and insulation methods.
5. Including labor safety measures, fire protection measures, and construction schedule bar chart.
6. According to the needs, cost accounting for civil engineering, equipment, installation and commissioning, detailed breakdown and summary prices based on customer feedback, analysis of operating costs, main indicators such as land area, installed operating power, and daily electricity consumption, elevation flow chart, and preliminary overall layout.

Service standards:
Prepare reports and report files that meet the depth requirements of the environmental impact assessment documents, with content that meets the requirements of laws and regulations, technical standards, design specifications, and other documents, to ensure the smooth passing of the environmental impact assessment review.

What the customer needs to provide:
1. Approval of construction unit information, project approval, feasibility study, planning and site selection, and water and electricity.
2. Product category and scale, production process and reaction mechanism, equipment name and model, material consumption and output.
3. Project land acquisition and dismantling, construction and production plan.
4. The total quantity control requirements approved by clean production and regulatory authorities.

Plan duration and delivery format:
1. Contract signing - expert review approval time, adjusted based on project size, product types, expansion and renovation, complexity and sensitivity.
2. Environmental Impact Assessment Report Form: 20-30 days.
3. Environmental impact assessment report: 75-180 days.
4. PDF electronic version.

Fee standard:
Collect according to the market situation of environmental impact assessment. Report table: 20000 to 40000 yuan, report book: 150000 to 300000 yuan, the price will be determined on a case by case basis based on project scale, product types, complexity and sensitivity, regional characteristics, etc.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Beijing Qinrunze Environmental Protection Technology Co., Ltd.
Location Wangchu Village, Doudian Town, Fangshan District, Beijing
Contact Person Frank He

Request A Quote

Please check your email address.
Your message must be at least 20 characters.