Guangzhou Gangwo Engineering Machinery Parts Department
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

709-10-53800 709-10-53801 Excavator Distributor Main Relief Valve Assembly Main Safety Valve For PC1100 PC1250 PC1250SE PC1250SP PC650

Price Negotiable
Price: Negotiable price
MOQ: 1PCS
Delivery Time: Within 2-7 Days After Receiving Payment
Brand: GVO
Product Description
Appliion

Excavator

Brand Name

GVO

Material

Alloy

After-sales Service Provided

Online Support

Shipment

Huangpu Port, Guangzhou, China

Size

tandard Size/custom Size

CONDITION:

100%New

High Ligh

709-10-53800 709-10-53801 Excavator distributor main relief valve assembly Main safety valve

price

Details consultation

Model Name

Excavator relief safety valve

Delivery logistics

Shipping express aviation

Appliion:

Machinery Repair Shops/Construction Works/Energy & Mining

 

The main relief valve of Komatsu 1100 distributor is usually a pilot relief valve, which consists of a pilot valve and a main valve.

  1. Oil enters the lower chamber of the main valve piston from the inlet, generating an upward force on the piston, and at the same time, oil enters the upper chamber of the piston through the damping hole, generating a downward force on the piston. Before the pilot valve core is opened, the upper and lower areas of the piston are the same, and the pressure is also equal. In addition, the main valve core spring has a downward force on the piston, so the main valve is closed.

 

2. When the inlet pressure of the overflow valve continues to increase and is greater than the pressure set by the pilot valve core, the pilot valve core opens, and the pressure oil in the upper chamber of the main valve is discharged through the pilot valve, and the pressure in the upper chamber becomes 0. At this time, under the action of the oil pressure in the lower chamber, the main valve moves upward, opens the valve core, and the pressure oil in the inlet flows into the oil discharge port through the main valve core, reducing the pressure of the inlet oil.

 

3. When the inlet oil pressure drops below the pressure set by the pilot valve, the pilot valve core closes, and the pressure is re-established in the upper chamber of the main valve, pushing the main valve core downward to close the main valve.

 

FAQ:
1.What do you mainly produce?

A;Our main business hydraulic Spare Parts,safety valve,Gear pump,hydraulic pump,control valve,Trave Motor Assy,swing motor,Seal kit, Electric parts,solenoid valve, engine assembly.etc.

2, Do you have stock for the goods?

A;We have plenty stock for many items in the warehouse.

3. Do you test all your goods before delivery?

A: Yes, we have a 100% test before delivery.

4.I know only the excavator model, but can not offer parts No., what should I do ?

A;If possible, you can send us the old photo, nameplate or the size for reference.

5.can I order one of our samples for testing first?

A: Of course!

SY115 Fuel Pump Metering 4JJ1SCV  Valve 294000-0490 294000 -1190 294000-1690 4JK1 4JJ1   Suction Control Valve 294200-2750  8981454550 1

 

B3.3dOil cut-off valve 0330001016 Injection Fuel Cut-off Solenoid Switch 12V 1

Welcome to contact us for Inquiry & orde

If you are not sure about the model and part number - please contact us via WhatsApp

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Gangwo Engineering Machinery Parts Department
Location Block 36, Building B, No.129, Zhucun East Ring Road, Tianhe District, Guangzhou
Contact Person ZHANG

Request A Quote

Please check your email address.
Your message must be at least 20 characters.