Beijing Hownew Energy Technology Group Co., Ltd
                                                                                                           
Verified Supplier
8 Years
Since 2018
Menu
Tools & Hardware Pipe Fittings

Alloy Steel A234 WP11 Elbow connecting High Temperature And High Pressure Pipelines of Power Plant

Price Negotiable
Price: Negotiable
MOQ: 10
Delivery Time: 7-30 days
Brand: HNEENERGY
Product Description

 Alloy Pipes and Fittings

Alloy pipes and fittings boast excellent corrosion resistance and high strength, making them widely used in industries such as petroleum, chemical, power, and shipbuilding. The characteristics of alloy steel elbows mainly include the following aspects:

  • Pressure Resistance

Alloy steel pipe fittings have good pressure resistance and can withstand high-pressure working conditions, ensuring the safe operation of the pipeline system.

  • Corrosion Resistance

Alloy steel pipe fittings possess excellent corrosion resistance, allowing them to withstand the erosion of acidic and alkaline media. This durability prolongs their service life and reduces maintenance costs.

  • Dimensional Stability and Ease of Installation

Alloy steel pipe fittings are known for their good dimensional stability and ease of installation. These characteristics enable them to meet the needs of various applications, thereby improving the efficiency of engineering construction.

Product Introduction

 

Material

ASTM A234 WP1,ASTM A234 WP5,ASTM A234 WP9,ASTM A234 WP11,ASTM A234 WP22,ASTM A234 WP91,WP92

A335 P11/ P91/ P92

ASTM A182 F5,ASTM A182 F9,ASTM A182 F11,ASTM A182 F22,ASTM A182 F91 etc.

Manufacturing Standards

ASME/ANSI B16.9, MSS-SP-43

JIS B2311/2220

DIN2615/2616/2617

ISO 3419,ISO 5251

Wall Thickness SCH5-STD-SCH XXS etc
Outside Diameter

1/2''-48''(Butt welding, seamless)

16''~110''(welding)

 

Manufacturing process and working principle of alloy steel pipe fittings

 

The manufacturing process of alloy steel pipe fittings usually includes processes such as material preparation, forging or cold stamping, and heat treatment. The working principle is to change the direction of the pipeline to achieve fluid steering and maintain the normal operation of the pipeline system.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Beijing Hownew Energy Technology Group Co., Ltd
Location Room 1510, Hengrun International Building, Haidian District, Beijing, China.
Contact Person Vincent

Request A Quote

Please check your email address.
Your message must be at least 20 characters.