Suzhou Huajing Air-Condition Purification Engineering Installation Co., Ltd.
                                                                                                           
Verified Supplier
23 Years
Since 2003
Menu

Clean Room Air Shower Room 2050mm Height One Person Coated Steel Door HEPA H14

Price Negotiable
Price: $2,000.00/sets
MOQ: 1 set
Delivery Time: 30 days
Brand: SHP
Product Description

Clean Room/Laboratory Coated Steel Door Air Shower Room for One Person

 

Product Overview

 


 

Air Showers are self-contained chambers installed at entrances to cleanrooms and other controlled environments.They minimize particulate matter entering or exiting the clean space.Personnel and materials entering or exiting the controlled environment are "scrubbed" by high velocity HEPA-filtered air jets with velocities of 20-22m/s(4000-4300fpm).Contaminated air is then drawn through the base within the unit,filtered and recirculated.

SHP is a leader in air showers for demanding applications in the micro-electronics,semiconductors,pharmaceutical,spray-painting,lab animal research and foodmarkets.

 

How the Air Shower Works


An air shower is normally installed between the gowning area and the controlled cleanroom area as part of the personnel purification route.

  • 1. Personnel Entry
    Personnel enter the air shower from the gowning or lower-cleanliness side.
  • 2. Door Interlocking
    The entrance and exit doors are controlled by an interlocking system to help prevent both doors from being opened simultaneously during normal operation.
  • 3. Air Shower Cycle
    Filtered air is supplied through directional nozzles to remove loose particles from exposed surfaces of cleanroom garments.
  • 4. Air Recirculation and Filtration
    The air circulation system recovers air and passes it through the filtration system according to the equipment configuration.
  • 5. Cleanroom Entry
    After the programmed shower cycle is completed, the exit door can be released and personnel proceed into the controlled area.

The actual shower cycle, airflow configuration, filtration arrangement and control logic should be selected according to the cleanroom design and project requirements.

Features at a Glance


  • High-Efficiency Particle Removal (Blow-down)

    • Mechanism: When a person or object enters the air shower, powerful fans draw air in and push it through High-Efficiency Particulate Air (HEPA) or Ultra-Low Penetration Air (ULPA) filters. This ultra-clean air is then ejected at high speed (typically 20-25 m/s) from strategically placed nozzles on the walls.

    • Effect: The high-velocity jets create a "scrubbing" action that dislodges and removes loose dust, lint, fibers, skin flakes, and other surface particles from clothing, hair, and materials.

  • Airlock & Containment Barrier

    • Interlocking Door System: Air showers are equipped with two doors that are electronically interlocked. Only one door can be open at a time.

    • Purpose: This creates a physical barrier that prevents unfiltered air from outside from flowing directly into the cleanroom. It helps maintain the cleanroom's critical positive air pressure, which is essential for keeping contaminants out.

Main Components & Construction


Component Function
Air Shower Chamber Enclosed personnel purification space
HEPA Filter High-efficiency air filtration
Fan / Blower Generates circulating airflow
Air Nozzles Direct filtered air toward personnel
Interlocked Doors Controls entry and exit
Control Panel Controls shower cycle and door operation
Lighting Provides internal illumination
Ceiling / Wall Panels Forms the cleanable enclosure
Floor Supports personnel and facilitates cleaning
Emergency Release Provides emergency door release where configured

Technical Specifications


Product Type Personnel Air Shower
Application Cleanroom Personnel Entry
Construction Coated Steel
Door Type Single Door
Door Interlock Mechanical / Electronic
Filtration Pre-filter + HEPA filter
Control Automatic / PLC-based
Lighting LED
Air Nozzles Adjustable
Shower Cycle Project-specific
Power Supply Project-specific
Working Dimensions 2050 mm (Height)
Overall Dimensions Customized
Number of Persons Single
Installation Indoor / Cleanroom Entrance
Surface Finish Project-specific

Main Specification for Air Shower


ITEM NO. PERSONNEL AIR SHOWER CARGO AIR SHOWER
SHP01 SHP02 SHP03 SHP04
EXTERNAL SIZE(W×D×H) mm 1300×1000×2050 1500×1000×2050 1500×2000×2050 2200×2000×2050
INTERNAL SIZE(W×D×H) mm 800×920×1895 800×920×1895 800×1920×1895 1500×1920×1980
PERSONS PER CYCLE one person one person two person N/A
BLOWING WAY one side blowing two sides blowing two sides blowing two sides blowing
BLOWER POWER 550w × 1set 550w × 2set 550w × 4set 750w × 2set
NO. OF NOZZLES 6 pcs 12 pcs 24 pcs 24 pcs
LED LIGHTS 20w × 1pcs 20w × 1pcs 20w × 2pcs 20w × 1pcs
PRIMARY AIR FILTER G3,G4
HEPA FILTER EFFICIENCY H14(99.99%@0.3μm) H14(99.99%@0.3μm) H14(99.99%@0.3μm) H14(99.99%@0.3μm)
SIZE OF HEPA FILTER 700×610×100 1pcs 700×610×100 2pcs 700×610×100 4pcs 700×610×100 4pcs
SPRAYING WIND SPEED 20-25m/s
SHOWER TIME 0-99s adjustable

Air Shower Types & Configurations


TypeTypical Application
Single-Person Air ShowerSmall cleanroom personnel entrance
Multi-Person Air ShowerHigher personnel throughput
Tunnel Air ShowerLarger personnel flow
Stainless Steel Air ShowerPharmaceutical / medical / hygiene-sensitive areas
Coated Steel Air ShowerGeneral cleanroom applications
Portable Air ShowerTemporary or flexible cleanroom applications
Customized Air ShowerProject-specific layouts and dimensions

Cleanroom Applications


Air Shower Rooms are typically integrated into the personnel purification route between gowning areas and controlled cleanroom spaces.

Typical applications include:

  • Pharmaceutical manufacturing
  • Medical and healthcare facilities
  • Laboratory environments
  • Electronics and semiconductor manufacturing
  • Food and beverage processing
  • Cosmetics production
  • Precision manufacturing

The air shower configuration should be selected together with the cleanroom layout, personnel flow, cleanliness requirements and operating procedures rather than treated as an isolated equipment component.

Engineering & Customization Process


  • 1. Requirement Analysis
    Review cleanroom classification, personnel flow, available installation space and operating requirements.
  • 2. Configuration Design
    Select the air shower type, dimensions, door arrangement, filtration and control configuration according to the project.
  • 3. Manufacturing
    Fabricate and assemble the chamber, filtration system, fan section, doors and control components according to the approved configuration.
  • 4. Factory Inspection
    Inspect the assembled unit, electrical system, door operation, interlock function and other applicable items before shipment.
  • 5. Installation & Commissioning
    Support site installation, connection and functional commissioning according to project requirements.
  • 6. Documentation
    Provide applicable product drawings, operation instructions, maintenance information and testing records.

Testing & Validation


  • Visual inspection
  • Dimension inspection
  • Door operation test
  • Door interlock test
  • Fan operation test
  • Lighting test
  • Control panel test
  • Airflow verification
  • HEPA integrity testing where applicable

Company Profile


 

As a leading supplier of clean room system and clean room products,SHP is an organization that prides itself both on technical expertise as well as next level customer care.SHP offers Cleanroom Solutions to meet our clients' particular requirements specialized for pharmaceutical,biotechnology and microelectronic cleanrooms.We also provide a range of Clean Room products including wall panel,door&window and a series of clean room equipment.

 

As an ISO 9001:2015 certified organization,we are committed to continually improving our customer service programs while meeting or exceeding your product quality criteria.With our comprehensive customer solution offerings,excellence in products,and decades of technical expertise,we are confident that SHP can match the best to your application.

 

Customer Photos


Our Certification


 

Products Description


  • Slide rail style door closer:A slide rail door closer for air showers is a high-durability, high-precision core functional component designed to safeguard cleanroom environments.
  • LCD control screen:The LCD control panel is not only the "intelligent brain" of the air shower but also a critical component that enhances equipment reliability, operational efficiency, and management standards.
  • Stainless steel nozzle:For cleanrooms with high standards, high-frequency usage, and stringent certification requirements (such as those in , biotechnology, microelectronics, precision instruments, etc.), stainless steel nozzles are an essential and wise choice. They offer exceptionally long service life, nearly zero maintenance costs, and irreplaceable reliability.
  • High efficiency filter:The HEPA filter is the "lungs" of the air shower, directly determining the quality of the blown air. Its ultra-high filtration efficiency, stable performance, and compliance are non-negotiable advantages.

Related Products


Our Customers


Packing and Shipping


Why Choose SHP


CapabilityEvidence
Cleanroom ExperienceEstablished in 2003
Engineering Experience20+ years
Manufacturing10,000+ m² workshop
Cleanroom Projects2,100+ completed projects
Global ExperienceProjects in 40+ countries
Engineering Team12 senior cleanroom/HVAC engineers
Product RangeAir Shower, FFU, Pass Box, AHU, Cleanroom Systems
Project ServiceDesign → Manufacturing → Installation → Commissioning

FAQ


Q1: Where is your company?

A1:Our company is located in Suzhou City, close to Shanghai. It's a 1.5-hour drive from PVG Airport.


Q2: Are you a manufacturer or a trading company? What can I buy from you?
A2: We are manufacturers. We focus on cleanroom projects, air showers, FFUs, through boxes, dosing rooms, laminar flow hoods and benches, AHUs, and sealed doors and Windows. 


Q3:When is your delivery time? 
A3: If your cleanroom project includes AHU, the delivery time is 35 days. If you purchase goods without an AHU, the delivery time is 10 days. 


Q4: How long is your warranty period? What kind of after-sales service can you offer?
A4: Our warranty period is two years after the completion of the project. During the warranty period, if there are any problems, we will replace it. If you can't handle it, we will send an engineer to solve it for free.


Q5:Can you conduct cleanroom validation? 
A5: Yes, we can offer documentaries of DQ, IQ, OQ and PQ. Still fat & Sitting. Product operation manual, maintenance guide and a complete set of cleanroom drawings. 


Q6:What are your advantages?
A6: We have a complete technical team consisting of 12 senior cleanroom and HVAC engineers to provide you with technical support. We have completed over 2,100 cleanroom projects in China and overseas. Such as Japan, Indonesia, Thailand, Bangladesh, India, North Macedonia, Saudi Arabia, Yemen, Russia, Moldova, Switzerland, Norway, the United Kingdom, Spain, France, Belgium, Kuwait, Tunisia, Mauritius, Sri Lanka, Mongolia, Philippines, Nepal, Sudan, Somaliland, Australia, New Zealand, Canada, Algeria, Egypt, Singapore, and the United States.

Related Videos

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Suzhou Huajing Air-Condition Purification Engineering Installation Co., Ltd.
Location No.1348 Jinshe Road,Jinjiaba Industrial Park,Wujiang,Suzhou,China
Contact Person Shen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.