Modular Container Energy Storage 400-800kW for Grid Peak Shaving and Stabilization
Price:
consult
MOQ:
1 piece
Delivery Time:
45-60 days
Brand:
1STESS
Product Description
Modular Container Energy Storage 400-800kW for Grid Peak Shaving and Stabilization
Product Specifications
| Project | Customized Capacity |
|---|---|
| Specification | 20/40ft |
| Power | 150KW-5MW |
| Energy | 300KWH-10MWH |
| Enclosure Protection Rating | IP54 |
| Operating Temperature | -20℃~+55℃ |
| Humidity | 5%~100% |
| Altitude | <3000M |
| Noise | <75dB |
| Communication | Modbus TCP/IP |
| Certification | UN3536, LVD, EMC, RoHS |
Product Overview
Our modular container energy storage system utilizes advanced lithium iron phosphate battery technology. The system capacity can be flexibly customized according to specific customer requirements, accommodating both new and second-life batteries. We support customer-specified battery and PCS configurations. The product integrates local EMS, fire control, air conditioning, and other subsystems, providing customers with a safe and versatile battery energy storage solution.
Key Features
- AC/DC Coupling Capability
- Multiple Energy Source Integration: Solar, diesel generator, wind turbine, and more
- Rapid Response Time: Less than 200ms
- Single Cluster Self-Management System
Applications
Frequently Asked QuestionsWho are we?
We are a professional manufacturer and solution provider of energy storage system products based in Shenzhen, Guangdong, China. Established in 2017, we serve customers across Africa, Europe, Southeast Asia, Middle East, and Eastern Asia.
What products can I purchase from you?
Our product portfolio includes inverters, storage lithium batteries, portable storage systems, residential energy storage systems, and container energy storage systems.
Do you provide OEM & ODM services?
Yes, we offer comprehensive OEM and ODM services tailored to your specific requirements.
What is your minimum order quantity?
We accept sample orders. For customized products, the MOQ varies by model. Please contact us online or via email at info@1stess.com for detailed information.
How do you ensure product quality?
Our factory holds ISO9001 certification. We maintain a comprehensive quality control management system covering incoming materials, production processes, and final delivery to ensure excellence at every stage.
What is the lead time for mass production?
Lead times depend on stock availability: 3-5 working days for in-stock items, and approximately 20-45 days for out-of-stock items, varying by quantity and model specifications.
What certifications do your products have?
Our products are certified with CE, MSDS, IEC, UN38.3, and other relevant industry standards.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shenzhen First Tech Co., Ltd.
Location
1404-1405A Tower A, Huahai Financial Creative Center,No.5073 Menghai Avenue,Qianhai Shenzhen-Hong Kong Cooperation Zone,Shenzhen,China
Contact Person
Jennifer