Complete Full Automatic 3 In 1 Plastic Bottle Pure Mineral Water Production Line Water Filling Machine
3000-36000bph automatic filling machine
Advantages:
High efficiency: The automatic bottled water filling machine can automatically complete a series of operations such as bottle feeding, liquid filling and sealing, which greatly improves the production efficiency.
Accurate filling volume: Advanced control systems and sensors enable real-time monitoring of parameters during the filling process to ensure consistent filling volume for each bottle.
Cost reduction: Labor costs are reduced by reducing the need for labor. At the same time, it helps to reduce the waste of raw materials and reduce production costs.
Improved safety: Advanced safety protection measures are adopted to ensure the safety of operators. During the filling process, the machine can automatically detect and deal with abnormal conditions, reducing the risk of industrial accidents.
Parameter Table
| model | DCGF14-12-6 | DCGF18-18-6 | DCGF24-24-6 | DCGF32-32-10 | DCGF40-40-12 | DCGF50-50-15 | DCGF60-60-15 |
| Yield (bottle / hour) | 2000-3000 | 3000-5000 | 5000-7000 | 7000-10000 | 10000-15000 | 16000-20000 | 20000-24000 |
| Filling accuracy | + 5 mm (liquid level) | ||||||
| Fill pressure (Mpa) | ≤0.4 | ||||||
| PET and bottle size (mm) | (Bottle diameter): φ 50- φ 115; (height): 160-320 | ||||||
| Suitable lid shape | Plastic cover or crown cover | ||||||
| Total power (Kw) | 4 | 5.2 | 6.2 | 6.2 | 7.5 | 11 | 15 |
| weight (Kg) | 2500 | 3500 | 4500 | 6000 | 7200 | 10000 | 11500 |
| Overall dimensions (mm) | 2250×1650×2250 | 2600×1965×2250 | 2980×2200×2250 | 3880×2200×2250 | 4000×2250×2500 | 5500×3500×2500 | 6500×5500×2550 |
Packaging and transportation
FAQ
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.
Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.
Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.
Q8: How can I pay you?
If you still don't know how to pay, just call me at+86 18203685329(whatsapp no.)
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.




