6mm-50mm HRB400 Hot Rolled Steel Rebar for Construction Reinforcement | 9m-12m Lengths
Price:
Negotiable
MOQ:
1 Ton
Delivery Time:
10-30 Days
Product Description
Hot Rolled HRB400 Steel Reinforcement Bars
Professional-grade deformed steel rebars designed for construction reinforcement applications. These hot-rolled ribbed bars provide superior bonding strength with concrete for enhanced structural integrity.
Product Specifications
| Parameter | Specifications |
|---|---|
| Product Name | Steel Rebar |
| Materials | HRB400, HRB400E, HRB500, HRB500E, ASTM A53 GrA/GrB, STKM11, ST37, ST52, 16Mn |
| Diameter Range | 6mm, 8mm, 10mm, 12mm, 13mm, 14mm, 16mm, 20mm, 22mm, 25mm, 30mm, 32mm, 40mm, 50mm |
| Standard Lengths | 1m, 3m, 6m, 10m, 12m (custom lengths available) |
| Standards Compliance | BS4449-2005, GB1449.2-2007, JIS G3112-2004, ASTM A615-A615M-04a |
| Surface Treatment | Galvanized, PVC coating, Black/color painting, Transparent oil, Anti-rust oil, Custom treatments |
| Certifications | AISI, ASTM, BS, DIN, GB, JIS |
| Packaging | Bundled (2-3 tons per bundle) or custom packaging |
International Standards Compliance
- HRB335/400/500: Chinese standard GB1499.2-2018, Hot-Rolled Ribbed Steel Bar
- ASTM A615 Gr. 40/60/75: American Standard, Plain Hot Rolled Ribbed Bar
- BS4449 Grade 250/460: British Standard, Hot Rolled Ribbed Steel Bar
- DIN 488 B500B: German standard, Hot-Rolled Ribbed Steel Bar
- JIS G3112 SD345/490: Japanese standard, Hot-Rolled Ribbed Steel Bar
Product Gallery
Company Information
Shandong Dingcheng Liye Material Company - Established in 2015, we are a modern iron and steel enterprise specializing in construction materials. Strategically located near major ports including Qingdao, Tianjin, and Shanghai for efficient global shipping.
Main Products: Carbon steel, stainless steel, galvanized series, PPGI/PPGL series, aluminum series, steel pipe, and section steel.
Frequently Asked Questions
- Samples: Available with sample fee and shipping cost (refunded upon order placement)
- Custom Production: We can produce according to your samples or technical drawings
- Payment Terms: ≤1000USD: 100% advance; ≥1000USD: 30% T/T advance, balance before shipment
- Delivery Terms: EXW, FOB, CFR, CIF, DDU
- Factory Visits: Warmly welcomed with professional sales team coordination
- Delivery Time: Typically 10-25 days after advance payment receipt
- After-Sales Service: 1-year warranty with free replacement of defective parts
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shandong Dingcheng Liye Materials Co., Ltd
Location
Building 107, Demai International Information Industry Park, Meilihu Street, Huaiyin District, Jinan City, Shandong Province
Contact Person
Sun