TWITTER R7000-22 Speed Road Bike with Hydraulic Disc Brake and Carbon Fiber Frame
Price:
$965.00/pieces 1-9 pieces
MOQ:
1
Delivery Time:
Negotiable
Brand:
TWITTER
Product Description
2021 Hot Sale Sniper 2.0 R7000-22 Speed Hydraulic Disc Brake R7000 Derailleur Transmission Carbon Road Bike
Product Description
Bike Model | Road Bike SNIPER2.0 -Disc brake | ||||||
ConfRev | R7000-22S, alloy wheel | ||||||
Wheel Size | 700C | ||||||
Frame Height | 46cm / 48cm / 50cm / 52cm / 54cm | ||||||
Bike Color | Red / Yellow / Blue / Orange / CementGray / Silver / Black / BlackRed / WhiteRed | ||||||
Net Weight | 8.9KG | ||||||
Frame | SNIPER2.0(Disc&thru-axle 12×142mm), high modulus Carbon,EPS,Aero-Racing,Inner-Cable,Gloss&UV laser decals | ||||||
Handelbar Sets | TW, Alu alloy,Matte&water decals,,Handlebar31.8×420,Stem90mm | ||||||
Clamps | Hidden Screw Fit to Frame | ||||||
Fork | SNIPER2.0, high modulus Carbon, 700C, UV laser colorful decals, Disc&thru-axle 12×100mm | ||||||
Seat Post | High modulus Carbon,Aero-Racing,water decals | ||||||
Head Sets | TW, Alu alloy CNC with sealed-Bearings 52*52mm | ||||||
Washer | Carbon 3K, 3×28.6×10mm | ||||||
Derailleur Handle | R7000-22S | ||||||
Front Derailleur | R7000 | ||||||
Rear Derailleur | R7000 | ||||||
Cranksets | AL alloy CNC,Hollow,34-50T | ||||||
Cassettes | 11S,11-28T | ||||||
Chain | 11S | ||||||
BB | BB86*46*24mm, pressed, Hollow&sealed Bearings | ||||||
Brake | Flat-mount&cable pull Hydr(metal radiator)+PRO float disc 140/140 | ||||||
Hubs | Alu alloy,4-sealed Bearings,Slotted,F24*R24 holes,Disc&thru-axle 12×F100_R142 | ||||||
Rim | Alu alloy AL7005,Double wall,Matte,W19×H36mm×700C | ||||||
Spoke | Flat 14G,bend head | ||||||
Tyre | 60TPI, 700C*25C | ||||||
Belt | Woven&Comfortable&Skid resistant | ||||||
Saddle | TW, comfortable&lightweight for racing | ||||||
Pedals | Alu alloy with Lightweight&Skid resistant | ||||||
Cables | JAGWIRE | ||||||
Accessories | Standard safety reflector for Handelbar,Seat post,Front wheel,Rear wheel PC bottle cage+Tools Manual+Warranty card | ||||||
Recommended products












Products Details














Certifications

Customer Evaluation

Factory & Delivery

FAQ
Q1. What is your terms of payment?
A: T/T30% in advance, and 70% before delivery.
Q2. How about your delivery time?
A: If stocking, 3-7days, If order, 15-30 days after receiving your advance payment.
Q3. Are you factory or trading company?
A: We are both factory and trading company.
Q4. What is your sample policy?
A: Sample is available, but the customers have to pay the sample cost and shipping cost.
Q5. Do you test all your goods before delivery?
A: Yes, We have own test controler.
A: T/T30% in advance, and 70% before delivery.
Q2. How about your delivery time?
A: If stocking, 3-7days, If order, 15-30 days after receiving your advance payment.
Q3. Are you factory or trading company?
A: We are both factory and trading company.
Q4. What is your sample policy?
A: Sample is available, but the customers have to pay the sample cost and shipping cost.
Q5. Do you test all your goods before delivery?
A: Yes, We have own test controler.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shaanxi Junwo'an Construction Engineering Co., Ltd.
Location
Room 21907, 19/f, Unit 2, Bldg. 2, Building B, Leading Times Plaza, No. 86, Gaoxin Road, Xi 'an, Shaanxi, China
Contact Person
Xie