Meat Processing Industrial Meat Bowl Cutter Machine for 5kw Automatic Vegetable Sausage
Price:
$2,600.00/sets >=1 sets
MOQ:
Negotiable
Delivery Time:
Negotiable
Product Description
Product Description
Automatic vegetable sausage chopper mixer meat bowl cutter machine

Working principle
The Bowl Cutter Chopper is used for chopping, mincing, and blending food ingredients. It is commonly used in commercial kitchens or food processing establishments. When operating the Bowl Cutter Chopper, the food ingredients are placed inside the bowl. The machine then chops, minces, or blends the ingredients as the blades rotate at high speeds. This process helps to quickly and efficiently process food items, saving time and effort in food preparation. The bowl cutters knife speed combined with the speed of the rotating bowl can be used to produce a variety of products from ground pork and beef, hamburgers and beef burger mixes, skin emulsion for use in poultry products, the chopping of veg and salads as well as processed cheese and fresh pork sausage mixes.
Specification
Model | volume | Capacity | Power | Dimension | Weight |
ZB-20 | 20L | 10~15kg/batch | 5kw | 780×600×850mm | 300kg |
ZB-40 | 40L | 20~25kg/batch | 5.1kw | 1100×860×950mm | 500kg |
ZB-80 | 80L | 50~60kg/batch | 12.65kw | 2160×1370×1350mm | 1200kg |
ZB-125 | 125L | 100kg/batch | 23.35kw | 2120×1550×1350mm | 1800kg |
ZB-200 | 200L | 120~150kg/batch | 57.25kw | 2350×2200×1910mm | 4000kg |
ZB-330 | 330L | 200kg/batch | 81.98kw | 2520×2130×2360mm | 5000kg |





FAQ
Q: What methods of payment are acceptable?
A: FOB, CFR & CIF optional; It’s mainly depend on client’s requirement; Accepted payment types: T/T, L/C;
Q: How can we guarantee the quality?
A: Always a pre-production sample before mass production; Always make a final inspection and trial running before delivery;
Q: What’s the lead time after placing order?
A: Usually it takes about 2-3 months after we received your deposit. However, it would depend on our production line schedule the timing
Q: What is the installation and training methods?
A: Our engineer will inspect and guide the installation of the equipment and the connection of the pipeline on site until the equipment is running smoothly.
Q: How can we guarantee the quality?
A: Always a pre-production sample before mass production; Always make a final inspection and trial running before delivery;
Q: What’s the lead time after placing order?
A: Usually it takes about 2-3 months after we received your deposit. However, it would depend on our production line schedule the timing
Q: What is the installation and training methods?
A: Our engineer will inspect and guide the installation of the equipment and the connection of the pipeline on site until the equipment is running smoothly.
Contact Us

Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shandong Innovaster Industrial Equipment Co., Ltd.
Location
Tuqiang Industrial Park, Weifang, Shandong, China
Contact Person
Sui