Manufacturing Plant Multi-Function Cooked Food Vacuum Cooler Pre Cooling Machine
Price:
$5,000.00/sets >=1 sets
MOQ:
Negotiable
Delivery Time:
Negotiable
Product Description
Product Description
Multi-Function Cooked Food Vacuum Cooler Pre Cooling Machine


Model | Volume | Machine dimension | Power |
CS1D-25 | 0.1 m³ | 620(depth)*420*400mm | 3.4 kw |
CS1D-50 | 0.25 m³ | 480(depth)*680*780mm | 9.1 kw |
CS1D-150 | 0.6 m³ | 900(depth)*680*1000mm | 17.65 kw |
CS1D-300 | 1.2 m³ | 900(depth)*700*1900mm | 22.5 kw |
Cooked food in industrial kitchens, (airline) catering & food factories needs to be cooled down before packing & selling. Cooling can take a long time and require high energy costs. Long cooling times will result in reduced shelf life and increased rejects, as bacteria growth is fast, especially at temperatures between 30 – 55 ⁰C (86 – 131 ⁰F). Vacuum cooling is the premium cooling choice over blast air cooling with respect to efficiency, reliability and product quality preservation.
① Vacuum cools way faster (15 to 30 min, as compared to hours), using much less space and also saving (50% or more) on electrical energy
② If you put gastronome racks in a vacuum cooler, you are 100% sure ALL food is cooled to the core and desired temperature,as vacuum cools “inside out”.
③ As you cool very fast, bacteria get no time to grow, increasing shelf life, reducing reject and
preserving quality.
preserving quality.




FAQ
Q: What methods of payment are acceptable?
A: FOB, CFR & CIF optional; It’s mainly depend on client’s requirement; Accepted payment types: T/T, L/C;
Q: How can we guarantee the quality?
A: Always a pre-production sample before mass production; Always make a final inspection and trial running before delivery;
Q: What’s the lead time after placing order?
A: Usually it takes about 2-3 months after we received your deposit. However, it would depend on our production line schedule
Q: What is the installation and training methods?
A: Our engineer will inspect and guide the installation of the equipment and the connection of the pipeline on site until the
equipment is running smoothly.
Q: How can we guarantee the quality?
A: Always a pre-production sample before mass production; Always make a final inspection and trial running before delivery;
Q: What’s the lead time after placing order?
A: Usually it takes about 2-3 months after we received your deposit. However, it would depend on our production line schedule
Q: What is the installation and training methods?
A: Our engineer will inspect and guide the installation of the equipment and the connection of the pipeline on site until the
equipment is running smoothly.
Contact Us

Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shandong Innovaster Industrial Equipment Co., Ltd.
Location
Tuqiang Industrial Park, Weifang, Shandong, China
Contact Person
Sui