2023 Year Cabbage Pre Cooling Machine Vacuum Cooler with 1000 KG Capacity
Price:
$5,000.00/sets >=1 sets
MOQ:
Negotiable
Delivery Time:
Negotiable
Product Description
Product Description
Cabbage pre cooling machine vacuum cooler

Rapid cooling immediately after harvesting is essential to maintain high quality, freshness and shelf life. In addition, it extends the possible storage time, allowing you to increase your market reach. The high cooling speed also enables same-day delivery. (Fast) Pre-cooling with vacuum is the only really effective way to achieve high cooling speeds and homogeneity (the whole load at the same temperature).

Model | Volume | Vacuum box size | Machine dimension | Cooling temperature | Cooling time |
CV1M-1 | 1 m³ | 1000*1000*1000mm | 2000*1200*1600mm | 40-5°C | 10-30min |
CV1M-2 | 2 m³ | 1100 1300*1500mm | 2500*1550 1700mm | 40-5°C | 10-30min |
CV1M-4 | 4 m³ | 1300 *2100*1500mm | 2600*2300*1750mm | 40-5°C | 10-30min |
CV1M-8 | 8 m³ | 2200*2100*1800mm | 4200*2350*2100mm | 40-5°C | 20-50min |
Benefits for Vegetables & Herbs Once harvested, stress arises that results in respiration and perspiration of the products. Both are mainly triggered by temperature. By quickly cooling your perishable produce with our vacuum coolers, this process can be reduced by 75% or more.
① Quality protection and maximum shelf life & storage (longer travel times possible).
② Thorough cooling, down to the core, independent of the density of the packaging or packaging style.
③ Lower workload for your cold room, resulting in less temperature fluctuations.
④ Added value for (export) customers, thanks to the higher & more consistent quality.
⑤ Less waste, disapproval and claims; save money and maximize your reputation.
⑥ Lower energy costs, since vacuum cooling is the most energy-efficient cooling method.




FAQ
Q: What methods of payment are acceptable?
A: FOB, CFR & CIF optional; It’s mainly depend on client’s requirement; Accepted payment types: T/T, L/C;
Q: How can we guarantee the quality?
A: Always a pre-production sample before mass production; Always make a final inspection and trial running before delivery;
Q: What’s the lead time after placing order?
A: Usually it takes about 2-3 months after we received your deposit. However, it would depend on our production line schedule
Q: What is the installation and training methods?
A: Our engineer will inspect and guide the installation of the equipment and the connection of the pipeline on site until the
equipment is running smoothly.
Q: How can we guarantee the quality?
A: Always a pre-production sample before mass production; Always make a final inspection and trial running before delivery;
Q: What’s the lead time after placing order?
A: Usually it takes about 2-3 months after we received your deposit. However, it would depend on our production line schedule
Q: What is the installation and training methods?
A: Our engineer will inspect and guide the installation of the equipment and the connection of the pipeline on site until the
equipment is running smoothly.
Contact Us

Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shandong Innovaster Industrial Equipment Co., Ltd.
Location
Tuqiang Industrial Park, Weifang, Shandong, China
Contact Person
Sui