Qingdao KXD Steel Structure Co., Ltd
                                                                                                           
Verified Supplier
24 Years
Since 2002
Menu

OEM High Load Prefab H beam Steel Structure Storage Warehouse Building

Price Negotiable
Price: USD 40-85 Per Square meter
MOQ: 200 square meters
Delivery Time: 35-55 days
Brand: KXD
Product Description

OEM Cheap Price High Load Prefab Steel Structure Storage Warehouse

 

 

 

 

H beam Steel Structure Warehouse Fabrication

Specifications

1) Main Steel

Q345, Q235, Q345B, Q235B etc.

2) Column & Beam

Welded or Hot rolled H-section

3) Connection method of steel structure

welding connection or bolt connection

4) Wall & Roof

EPS, Rockwool, PU sandwich, corrugated steel sheet

5) Door

Rolled up door or Sliding door

6) Window

Plastic steel or Aluminum alloy window

7) Surface

Hot dip galvanized or painted

8) Crane

5MT, 10MT, 15MT and more

Steel structure building is one kind of product which can be design as per every proples' different need.

So, if you found that follows example pictures is not as same as your want, even it is very different.

do not worried,no matter which kind of building you need, bigger, smaller or multi-storey, just tell me the data or drawing of building what you need.

We will make the exact design, quotation and rendering for you as soon as we can.

(our factory have more than 30 years experience on steel structure no matter for the design or production process.

 

 

Main Steel Structure:
A.The Main steel structure: Q355B Q345B Q235B H column Beam B.Secondary Steel Structure: Q355B Q345B Q235B Square tube/ angle iron / circular tube etc
C.Purlin: Hot dipped galvanized C Z shape purlin
D.Floor decking:Galvanized 750 type decking sheet

 

Please pay attention:

Fixed packing, loading, transportation, unloading details:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Qingdao KXD Steel Structure Co., Ltd
Location No.17 Changjiang Road, Pingdu, Qingdao,Shandong Province,China.
Contact Person Andy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.