EV Relays DC Contactor Terminal Parts Moving Pad Assembly with Stamping Service
Price:
Negotiable
MOQ:
Negotiable
Delivery Time:
Negotiable
Brand:
SINBO
Product Description
EV Relays DC Contactor Terminal Parts Moving Pad Assembly with Stamping Service
Product Specifications
| Application | Electric Vehicle |
|---|---|
| Termination Style | Solder Pin |
| Mounting Type | PCB Mount |
| Contact Material | Silver Alloy |
| Dimensions | Varies depending on model |
| Coil Voltage | 12V-1000V |
| Contact Form | 1 Form A (SPST-NO) |
| Certifications | UL, CE, RoHS |
| Operating Temperature | -40°C to 85°C |
| Current Rating | 10A-500A |
| Type | DC Contactor |
| Voltage Rating | 12V-1000V |
Product Images
Manufacturing Specifications
| Service | CNC Turning, CNC Milling, Laser Cutting, Bending, Spinning, Wire Cutting, Stamping, Electric Discharge Machining (EDM), Injection Molding |
|---|---|
| Material |
Brass: 260, C360, H59, H60, H62, H63, H65, H68, H70, Bronze, Copper Aluminum: 2000 series, 6000 series, 7075, 5052 etc Stainless steel: SUS303, SUS304, SS316, SS316L, 17-4PH etc Steel: 1214L/1215/1045/4140/SCM440/40CrMo etc Plastic: Acetal/POM/PA/Nylon/PC/PMMA/PVC/PU/Acrylic/ABS/PTFE/PEEK etc |
| Surface Treatment | Anodize, Bead blasted, Silk Screen, PVD Plating, Zinc/Nickle/Chrome/Titanium Plating, Brushing, Painting, Powder Coated, Passivation, Electrophoresis, Electro Polishing, Knurl, Laser/Etch/Engrave etc. |
| Tolerance | +/-0.001mm |
| Drawing Accepted | STP, STEP, LGS, XT, AutoCAD(DXF,DWG), PDF, or Samples |
| Lead time | 1-3 weeks for samples, 3-5 weeks for mass production |
| Quality Assurance | ISO9001.2015, SGS, RoHs, IATF16949.2016 |
| Payment Term | Trade Assurance, TT/West Union |
| Price | Negotiable |
| Supply Ability | 10000000pcs/Month |
Frequently Asked Questions
How is quality ensured? What certificate do you have?
We have obtained ISO9001 quality management system certification, IATF16949 automotive quality system certification, and also we have a professional quality team and professional inspection and testing equipment to ensure quality.
What's your delivery time?
It depends on quantity, generally will takes 10-25 days after order confirmation (7-25 days for mold opening and 5-10 days for production and processing).
Do you offer custom products?
If you have your own product drawing or a sample, please send us, and we can custom-made the hardware as your required. We have a professional technical team, and if possible we also will provide our professional advices of the products.
How should I order and make payment?
For bulk production, 50% T/T in advance, balance before shipment. 100% in advance if less than USD 5000.
What material of the product can you supply?
Steel, Stainless steel, aluminum, Brass, copper, nylon, steel, etc.
Which surface treatments do you support?
Polishing, Painting; Chroming, Anodizing, Brushing; Texture, Sandblasting; UV coating.
Are you trading company or manufacturer?
We are manufacturer.
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Sinbo Precision Mechanical Co., Ltd.
Location
No.7,Mingzhu 2 road,Shebei,Huangjiang,Dongguan,Guangdong,China 523752
Contact Person
Ho