Hangzhou great welfare technology co., ltd
                                                                                                           
Verified Supplier
6 Years
Since 2020
Menu

Polystyrene Waffle Pod Slab Making Machinery for Australian Market Customized Options

Price Negotiable
Price: Negotiable
MOQ: 1 Set
Delivery Time: Peak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Product Description
polystyrene waffle pod slab making machinery for Australian market
 
Product Description

Polystyrene Waffle Pod Slab Making Machinery for Australian Market

HS-CXJ Series EPS shape moulding machine main features:

  • The machine is made of all steel plate welded, with high strength and good stability;
  • After the machine is welded and tempered at high temperature, it is processed by CNC machining center, and the bottom layer is fine sandblasted to remove rust, with high corrosion resistance;
  • The stroke adjustment is controlled by encoder with high-precision and convenient adjustment;
  • Conventional feeding and vacuum high-pressure feeding can be used. The material level of the barrel is induced and the material can be supplied by itself
  • imported angle seat valve and high-frequency valve are adopted to ensure the steam stability and save the steam consumption;
  • adopting high-efficiency vacuum cooling and an independent drainage system to greatly shorten the vacuum time and reduce the water content of the product;
  • Adopting PLC control and computer touch screen operation for simple and stable operation;
HS-CXJ Series EPS shape moulding machine technical data:
Item unit HS-CXJ-1800 HS-CXJ-2000 HS-CXJ-2230
Mould size mm 1800*1600 2000*1800 2230*2160
Max. Product size mm 1630*1430*400 1830*1630*400 2060*1990*400
Size for filling guns mm 1650*1450 1850*1650 2050*2000
Steam Pipe inlet mm DN100 DN100 DN150
Mould inlet mm DN40 DN40 DN50
Pressure Kg/cm2 3~6 4~7 5~8
Consumption Kg/cycle 2~4 3.5~4.5 5~6.6
Cooling water Pipe inlet mm DN80 DN80 DN100
Mould inlet mm DN25 DN25 DN32
Pressure Kg/cm2 3~4 3.5~4.5 5~6.8
Consumption Kg/cycle 20~35 25~40 35~45
Temperature ºC 40~50 40~50 40~50
Compressed air Pipe inlet mm DN65 DN65 DN65
pressure Kg/cm2 4~5 4~5 4~5
consumption m3/cycle 0.020~0.035 0.025~0.040 0.030~0.045
Vacuum system Pipe inlet mm DN80 DN80 DN80
Pumping rate m3/h 280 280 280
Motor kw 7.5 7.5 7.5
Drain pipe size mm DN150 DN150 DN200
Power kw 16.5 16.5 18
Machine size m 5.15*2.72*4 5.15*2.92*4.2 5.25*2.72*4
Machine weight kg 8000 10000 15000
 
Detailed Photos

Polystyrene Waffle Pod Slab Making Machinery for Australian MarketPolystyrene Waffle Pod Slab Making Machinery for Australian MarketPolystyrene Waffle Pod Slab Making Machinery for Australian Market

Company Profile

Polystyrene Waffle Pod Slab Making Machinery for Australian Market
Zhejiang Huasheng Machinery Equipment Co., Ltd, located in Fuyang, Hangzhou City, China, is a manufacturer
for high-end EPS foam machinery and EPS moulds.


Huasheng has developed into a modern and standardized production base with an area of over 18, 000 square meters,
more than 100 employees and a team of highly qualified and educated researchers, and obtained 15 invention patents.


The main products  include high-precision automatic pre-expander machine, fully automatic shape molding machine ,
EPS block moulding machine, EPS foam mold, EPS lost foam white area equipment etc.


We warmly welcome all customers and friends from both domestic and abroad.

Company show

Polystyrene Waffle Pod Slab Making Machinery for Australian Market
Certifications

Polystyrene Waffle Pod Slab Making Machinery for Australian Market

Packaging & Shipping

Polystyrene Waffle Pod Slab Making Machinery for Australian Market

FAQ

Q: Are you a factory or trading company?
A: We are a factory of EPS machine and EPS mold.

Q: what is your payment term?
A: 30% down payment upon order confirmation, 70% balance payment before shipment.

Q:what is your delivery time?
A: It takes usually 45-60days for machines, and 25-30days for EPS mold.

Q: Do you send engineer to our local place to instruct installation?
A:Yes,if you need,we will arrange engineer for you,and we can provide turn-key job.

Q: Warranty?
A: One year warranty after installation is completed.During warranty period, for broken parts not by man-made and wear parts, factory seller will replace free of charge. the shipping cost will be borne by buyer, seller will equip standard spare wear parts to buyer.

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Hangzhou great welfare technology co., ltd
Location No.88 Guanting, Baiqian Village, Luzhu Town, Fuyang District, Hangzhou City, Zhejiang Province, China 311405
Contact Person Yan

Request A Quote

Please check your email address.
Your message must be at least 20 characters.