Two-Part Loudspeaker Epoxy AB Glue Fast Curing High Strength Adhesive For Speaker Magnet Assembly And Audio Equipment Repair
| Main Material: | Acrylic | Color: | A:Semi Transparent,B:Dark Red |
|---|---|---|---|
| Viscosity: | 3000-9000cps | Solid Content: | 100% |
| Initial Curing: | 3-5 Mins | Full Curing: | 24 Hours |
| Shelf Life: | 6 Months | Temperature Resistance: | High |
| Vibration Resistance: | Strong | Electrical Insulation: | Good |
| Weather Resistance: | Good | Curing Shrinkage: | Less |
| Film Quality: | Hard | Permeability: | Strong |
| Odor Level: | Low | ||
| Highlight: |
3-5 mins Initial Curing Double Component Loudspeaker Adhesive,24 hours Fully Curing Epoxy AB Glue,6 Months Shelf Life Modified Acrylic Adhesive |
||




This high-performance modified acrylic adhesive is specially designed for electronics, lighting, and related industries.
Ideal for bonding hard plastics and metals, particularly effective for speaker components including three-point voice coils, elastic waves, and drum paper, delivering excellent adhesion results.
- Low odor formulation
- Exceptional adhesion strength
- High temperature and vibration resistance
- Excellent electrical insulation properties
- Superior weather resistance
- Minimal shrinkage after curing
- Hard film quality with strong permeability
- Thoroughly clean glue guns equipped with mixers before use. Mixed adhesive should not remain in the gun for more than 1 minute to prevent clogging.
- After use, remove and soak spiral blades in solution with the glue gun. Allow 2-4 hours for sound gauge adjustment at 25℃.
- Below 15℃, viscosity and curing time change significantly. Warm adhesive in 35℃-45℃ water or oven for 30 minutes before use to maintain performance.
- Testing should occur 24 hours after application at 25℃-35℃, or 48 hours when temperatures are below 15℃.
- Maintain proper workplace ventilation and keep away from children
- In case of skin or eye contact, rinse immediately with water or seek medical attention
- Never mix components before use and ensure proper cap replacement after use
- Store in cool, dry, well-ventilated areas away from heat sources
- Conduct preliminary tests for bulk applications to ensure proper bonding





We are a factory with our own manufacturing facilities.
Yes, we provide free samples with the customer responsible for shipping costs.
Sample preparation takes 5-7 days with additional 5-7 days for express delivery.
Standard production time is 3-7 days.
Our MOQ is 3000 pairs.
We have experienced workers and a dedicated QC team performing 100% inspection before packaging.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.