DG4V-3-2A-M-U-H5-60 Solenoid Hydraulic Control Valve with External Thread Connection and 1000pcs/Month Production Capacity
Price:
US$10.00-90.00
MOQ:
1 Piece (MOQ)
Delivery Time:
30 days (1 - 1 Pieces) To be negotiated ( > 1 Pieces)
Brand:
DZ
Product Description
DG4V-3-2A-M-U-H5-60 Solenoid Hydraulic Control Valve
Product Overview
This DG4V-3-2A-M-U-H5-60 solenoid hydraulic control valve is a high-performance component designed for precision fluid power applications. Manufactured to Vickers specifications, it delivers reliable operation in demanding industrial environments.
Manufacturer Advantages
- Extensive inventory of hydraulic valves available
- Professional hydraulic supplier with domestic and international experience
- Four manufacturing facilities in China with over 10 years of industry expertise
- Assured warranty protection and reliable industry reputation
- Customized valve configurations accepted
Technical Specifications
| Specification | Details |
|---|---|
| Model Number | DG4V-3-2A-M-U-H5-60 |
| Standard | Standard |
| Connection Mode | External Thread |
| Power Source | Hydraulic |
| Material | Iron |
| Type | Single Seater |
| Application | Hydraulic Pump, Hydraulic Station, Hydraulic Power Station |
| Actuation | Electric |
| Package Dimensions | 20cm × 20cm × 15cm |
| Production Capacity | 1000 pieces per month |
| Origin | China |
Product Images
Frequently Asked Questions
Are you a factory or a trading company?
We have a production and sales department that mainly sells imported brand products while producing our own brand products.
How to order?
Inquiry from us → confirm product model with drawings → inform us of the model used → receive our model confirmation and quotation → negotiate details → confirm order → sign contract/payment → arrange preparation and shipment → goods ready → balance/delivery → further cooperation.
Which transportation method is available?
International express delivery, air freight, and sea freight can all provide services, and some countries can arrange railway transportation.
How long does it take for delivery and shipment?
The delivery time depends on the quantity you order. It usually takes 5-7 working days.
My package is missing some products. What can I do?
Please contact our support team, and we will confirm your order content through packaging. We will compensate for shipping based on the actual situation.
How to confirm payment?
We accept telegraphic transfer, PayPal, or payment within China. Other payment methods are also acceptable. Please contact us before you make payment through other payment methods. An additional 30-50% deposit is feasible, and the remaining payment should be made before shipment.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Changzhou Dazhuo Testing Equipment Co., Ltd
Location
No. 13, Longyu Road, Wujin National High-tech Industrial Development Zone
Contact Person
Jane Guo