Changzhou Dazhuo Testing Equipment Co., Ltd
                                                                                                           
Verified Supplier
4 Years
Since 2022
Menu

90R130 Hydraulic Charge Pump for Excavator - Carbon Steel Construction with 500 Pieces/Month Production Capacity

Price Negotiable
Price: Negotiation
MOQ: 1 Piece (MOQ)
Delivery Time: 30 days (1 - 1 Pieces) To be negotiated ( > 1 Pieces)
Brand: DZ
Product Description
Product Overview

The 90R130 Hydraulic Charge Pump is engineered for excavator applications, constructed from durable carbon steel material to ensure long-lasting performance in demanding industrial environments.

Technical Specifications
Specification Details
Model Number 90R130
Power Type Hydraulic
Pump Type Normal Line Gear Pump
Material Carbon Steel
Application Excavator
Usage Oil
Certifications CE, ISO
Production Capacity 500 Pieces/Month
Origin China
Key Features
Durable Construction: Carbon steel material ensures extended service life
Quality Certified: CE and ISO certified for reliable performance
Industrial Application: Specifically designed for excavator machinery
Hydraulic Efficiency: Normal line gear pump design for optimal fluid transfer
Company Expertise

With over 10 years of industry experience, we specialize in hydraulic components including A2FM, A2FO, A6VE, A6VM, A7VO, A8VO, A10VSO, A4VG, and A10VG series. We maintain substantial inventory and offer competitive Chinese brand alternatives.

Product Images
90R130 Hydraulic Charge Pump for Excavator A10VSO Hydraulic Pump for Industrial Equipment A10VSO Hydraulic Pump Internal Components Hydraulic Pump Packaging and Protection Hydraulic Pump Manufacturing Process
Ordering & Delivery Information
Delivery Time
  • In-stock items: Within 3 days
  • Custom orders (less than 50 pieces): Within 5 days
  • Larger quantities: Delivery time varies based on order size
Minimum Order Quantity

No minimum order for common models in stock. Volume discounts available for larger quantities.

Shipping Methods
  • Courier (DHL, UPS, FedEx): 5-7 days door-to-door delivery
  • Air Freight: 3-5 days to airport
  • Sea Freight: 20-30 days to seaport

For urgent deliveries, we recommend courier or air freight options.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Changzhou Dazhuo Testing Equipment Co., Ltd
Location No. 13, Longyu Road, Wujin National High-tech Industrial Development Zone
Contact Person Jane Guo

Request A Quote

Please check your email address.
Your message must be at least 20 characters.