Chongqing Liyu Precision Technology Co., Ltd.
                                                                                                           
Verified Supplier
13 Years
Since 2013
Menu

62mm Galvanized Steel Nails Durable and Long-lasting for Enhanced Building Structure

Price Negotiable
Price: $0.05/pieces 10000-99999 pieces
MOQ: 10000 pieces
Delivery Time: Negotiable
Brand: ODM
Product Description

Durable Plastic Insulation Nails for Exterior Wall for Enhanced Building Structure and Thermal Efficiency

 

Keywords:insulation pin / heat insulation nail / heat preservation nail / plastic dowel

 

Heat Preservation Nail Factory/Insulation Fixing Nail 
Material: low carbon steel galvanized iron wire, plastic, etc. 
Surface Treatment: Galvanized. 
Features: Nylon Stud with thermal insulation cap, effectively reduce the thermal conductivity, more energy saving. Anchor's own unique design, can effectively increase the efficiency of construction.
Suitable substrates: concrete, lightweight concrete, bricks, etc. 
Using: can be widely used for slab heating, enhance the wall of construction, and for sound insulation.

 

Plastic length:30-200mm

30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 80mm, 90mm, 100mm, 110mm, 120mm, 130mm, 140mm, 150mm, 160mm, 170mm, 180mm, 200mm

 

Plastic washer diameter:50mm

Steel nail (Forged) length: 42mm,52mm,62mm

 

 

 

 

 

 

 

 

 

Related Tools:

 

(1)GAS ACTUATED INSULATION NAILER:

(1)AIR POWERED INSULATION NAILER:

 

 

 

 

Shipping:

 

Our Service:

Your inquiry related to our product & price will be replied within 1hours.
Well-trained & experienced staff are to answer all your inquiries in English of course.
Working time: 9:00am - 6:00pm, Monday to Friday (UTC+8).
OEM & ODM projects are highly welcomed. We have strong R&D team here to help.
Your business relationship with us will be confidential to any third party.
Good after-sale service offered, please get back if you got question.

 

Trade Terms:
Payment: 30% T/T deposit payment in advance, balance against copy of B/L, Western Union, Paypal
Production Lead Time: 5 - 10 days after deposit payment.
Shipping Methods: by air, by sea
FOB Shipping Port: Shanghai,MAINLAND CHINA.
If you want to deal with EXW/CIF/CNF term instead of FOB, please specify. Otherwise, FOB price will be quoted
under inquiry.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Chongqing Liyu Precision Technology Co., Ltd.
Location Room 9-3, Building 12, No. 135, Kecheng Road, Chongqing, China
Contact Person Tang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.