Overhead Conveyor Powder Coating Line for Sheet Metal Parts 20000.00cm * 200.00cm * 400.00cm Package Size
This powder coating production line is specifically designed for coating sheet metal components of electric control cabinet chassis in a wide range of sizes and geometries. The system features a polypropylene (PP) spray booth, offering excellent chemical resistance and long service life.The coating process combines automatic electrostatic spraying with manual touch-up coating, ensuring uniform coverage across flat surfaces, edges, and complex structures. A monorail overhead conveyor system provides stable, continuous transportation of workpieces throughout the entire coating process.
Production Line Workflow
1. Hanger Stop & Elevator: PositioningThe hangers stop at the loading station while the elevator descends to assist operators with manual hanging of the sheet metal workpieces.
2. Pre-Spray Treatment: Workpieces move step-by-step through multiple pre-treatment stations. At each station, the parts stop for spraying and cleaning operations, ensuring thorough surface preparation before coating.
3. Moisture Drying: After pre-treatment, the workpieces accumulate in a drying zone where residual moisture is completely removed, preparing the surfaces for high-quality powder application.
4. Manual Spray Booth: The workpieces pause in the manual spray room, allowing operators to perform detailed coating on corners, recesses, and areas requiring special attention.
5. Automatic Spray Booth: In the automatic spray booth, workpieces move continuously at a controlled speed of 1.0–1.5 m/min. Automatic spraying is combined with supplementary manual spraying to achieve consistent, full-surface coverage.
6. Powder Solidification: Following spraying, the coated workpieces are accumulated in an inclined arrangement to ensure proper powder solidification, resulting in a durable and uniform coating layer.
7. Natural Cooling: The workpieces stop in the cooling area to undergo natural cooling, allowing the coating to stabilize and maintain its mechanical and aesthetic properties.
8. Transfer to Assembly Area: Once cooled, the finished parts are conveyed to the assembly area for subsequent operations such as component installation or packaging.
9. Elevator Down & Manual Unloading: Finally, the elevator descends to assist operators in manually removing the finished workpieces, preparing them for shipment or further processing.

Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.