Product Description
Double-layer Container House with Inner Corridor
Product Overview

The prefabricated mobile house features a continuous layout of the inner corridor and flexible space division, with strong rock wool insulation and fire resistance properties.

Key Specifications
Attribute Value
Product Name Double-layer Container House with Inner Corridor
Forklift Slot Bottom crossbeam welded with slots (1200mm spacing)
Fire Resistance B1 grade fire resistance
Corner Parts ISO standard cast corner parts
Door & Window Configuration Anti-theft door, plastic-steel sliding window/aluminum alloy window with anti-theft net
Wall Construction Double-sided color steel sandwich panels
Circuit Protection 20A leakage protection device
Electrical System Standard configuration
Installation Process
Foundation Construction Phase
Foundation Type Selection

The foundation type is determined by site geological conditions and load-bearing requirements. Options include independent foundations, strip foundations, and pile foundations (for soft soil layers).

Independent Foundation Construction

Excavate foundation pits 100-200mm larger than foundation size (depth 0.5-1.5m). Pour concrete cushion (100mm thick, C15 grade). After curing (≥70% strength), install reinforcement (HRB400 grade steel), formwork, and pour foundation concrete (C30-C35 grade) with proper curing (≥7 days).

Embedded Parts Installation

Install foundation embedded parts (steel plates, anchor bolts) with precise positioning: ±2mm plane position, ±1mm elevation deviation. Anchor bolt verticality ≤1/1000, top elevation ±2mm. Ensure reliable connection to foundation reinforcement.

Container Module Installation
Bottom Layer Installation

Position crane and use specialized spreader for stable lifting. Adjust module to ≤2mm/m levelness and ≤1.5mm/m verticality. Connect modules with high-strength bolts (200-300N*m torque). Weld or bolt to foundation embedded parts with quality control.

Upper Layer Installation

Install temporary hoisting bracket on lower module. Clean connection surfaces before lifting upper module. Align corner pieces precisely and connect with high-strength bolts. Install expanded space components (terraces, canopies) simultaneously.

Enclosure & Component Installation
Wall & Roof Installation

Install lightweight insulated composite panels (50-100mm rock wool sandwich panels) with tongue-and-grove joints and sealing strips. Roof panels fixed with self-tapping screws (300-400mm spacing) and waterproof gaskets. Apply waterproof rolls and sealants at lap joints.

Door & Window Installation

Check opening dimensions and clean debris. Secure frames with expansion bolts/nails. Fill gaps with foam rubber and seal with weatherproof sealant for flexible operation and optimal sealing.

Stairs & Railings

Install prefabricated steel stairs (30°-45° slope, ≤2mm/m levelness) with proper corrosion protection. Railings (1.05-1.2m height, ≤110mm vertical spacing) welded/bolted to structure with corrosion treatment.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Heng Ye Haoxu ( Tianjin ) Integrated House Co., Ltd.
Location Unit 804-1, Building A1, TEDA MSD-A Area, No. 56 Second Street, Tianjin Economic and Technological Development Zone, China
Contact Person Xu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.