Modular quick assembly, efficient utilization of double-layer space, double-layer container house with inner corridor, wind and earthquake resistant design
Price:
Negotiable
MOQ:
1 piece
Delivery Time:
3 days
Brand:
HY
Product Description
Modular Quick Assembly Double-Layer Container House with Inner Corridor
Product Specifications
| Product Name | Double-layer Container House with Inner Corridor |
| Forklift Slot | Bottom crossbeam with welded slots (1200mm spacing) |
| Fire Resistance | B1 grade fire resistance rating |
| Corner Parts | ISO standard cast corner parts |
| Door & Window Configuration | Anti-theft door, plastic-steel sliding window/aluminum alloy window with anti-theft net |
| Wall Construction | Double-sided color steel sandwich panels |
| Electrical Protection | 20A leakage protection circuit breaker |
| Electrical System | Standard configuration |
Installation & Construction Process
Electrical, Plumbing, and Interior Finishing
Plumbing Pipeline Installation
Water supply and drainage pipelines are installed according to design specifications:
- Water supply pipes: PP-R pipes or galvanized steel pipes
- Drainage pipes: PVC-U pipes with socket-type connections
- Pipe supports spaced at 0.6-1.0m for PP-R, 1.0-1.5m for PVC-U
- Complete installation of water taps, sanitary ware, and floor drains
Electrical System Installation
Comprehensive electrical infrastructure implementation:
- Lighting, power, and weak-current circuits (network/phone/TV)
- Steel or PVC conduit installation avoiding structural stress points
- Distribution boxes at 1.5m height, switches at 1.3m, sockets at 0.3m
- Secure wiring connections using terminal blocks or welding
Interior Finishing Options
Wall Treatments:
- Latex paint (with proper base preparation)
- Wallpaper or integrated wall panels
Flooring Options:
- Floor tiles with dry-hard cement mortar base
- Moisture-treated wooden flooring (floating or fixed)
- Epoxy flooring with primer/middle/top coat application
Ceiling Systems:
- Light steel keel ceilings (1.2m main keel spacing)
- Integrated ceiling panels with proper sealing
Partition Walls:
- Gypsum partition boards or color-steel panels
- Glass partitions with aluminum/stainless steel frames
Finalization & Quality Assurance
Commissioning & Inspection
- Comprehensive cleaning and sanitization of all spaces
- Functional testing of all doors, windows, and locks
- Electrical and plumbing system performance verification
- Structural integrity checks of stairs and railings
Quality Acceptance Process
Sub-Project Verification:
- Foundation concrete strength and dimensional accuracy
- Container module installation precision and connection integrity
- Wall panel sealing and insulation performance
Final Project Acceptance:
- Structural safety verification through deformation detection
- Complete documentation review (drawings, test reports, records)
- Sign-off by construction, design, and supervision teams
This modular construction solution offers rapid deployment, efficient space utilization, and full compliance with wind/earthquake resistance standards, making it ideal for temporary or permanent modular building applications.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Heng Ye Haoxu ( Tianjin ) Integrated House Co., Ltd.
Location
Unit 804-1, Building A1, TEDA MSD-A Area, No. 56 Second Street, Tianjin Economic and Technological Development Zone, China
Contact Person
Xu