Changsha Potency Mechanical Technology Co., Ltd.
                                                                                                           
Verified Supplier
34 Years
Since 1992
Menu

153KW Diesel Engine Arch Installation Trolley Tunnel Arch Frame Trolley

Price Negotiable
Price: Negotiable
MOQ: 1 Unit
Delivery Time: 45 Working Days
Brand: POTENTIAL / POTENCY
Product Description

KGM12200 Efficiently Install Arches with Arch Installation Trolley for Tunnel Construction Projects

Product Description:

Potential/Potency KGM12300 Arch Frame Trolley is the first arch frame trolley in China with the ability to erect multiple arches at once.

Features:

1. Adopting engineering chassis, four-wheel drive, strong climbing ability; Four wheel steering with a small turning radius;
2. Three working arm frame, arm frame form: folding+telescopic structure (upper arm+middle arm+lower arm, middle arm extendable); The transportation status can be folded and returned to the frame as a whole;
3. Dual work platform with arch dragging and clamping device on the platform; And the left arm has a crane function for accompanying the vehicle;
4. The main arm has a multifunctional platform that can simultaneously clamp 1-3 arches and quickly lift them into place;
5. Multiple arches can be transported and formed with the vehicle;
6. Controller control, large screen display of parameters, real-time monitoring of system operation status;
7. The arm frame control intelligent assistance system can achieve rapid positioning of the arch frame and improve efficiency.
 

Technical Parameters:

No. Items Unit Data
1 Whole Machine Total weight t 29
Travel speed km/h 0~20
Walking mode / Tyre
Traction / 4 wheels drive
Steering / 4 wheels steering
Minimum turning radius m inner 3.0/outer 7.5
Ground clearance mm 400
Grade ability ° 25
Max. operating height m 12
Max. operating width m 15
Transportation dimension (L x W x H) m 11000×2800×4300
2 Diesel Engine Type / 6 cylinder water cooled
Rated power KW 153
3 Motor Rated power KW

90

4 Boom Max. working length m 12
Max. extended length of main boom m 14
Max. extended length of auxiliary boom m 16.5
Pallet payload kg 2000
Platform payload kg 400
Payload of lifting mechanism kg 2000
Platform of mini crane on platform kg 400
5 Electrical System Operating mode / Wireless
Control mode / Controller
6 Cable Reel Power supply / 380V/50HZ (customizable)
Current A 240

Applications:

 

The main application scenarios of tunnel arch installation trolleys KGM12200 include railway tunnels, highway tunnels, urban underground pipe galleries, mining tunnels, etc. ‌

Railway tunnel: In railway tunnel construction, the tunnel arch installation trolley is used to quickly and accurately install the arch, provide early support structure, and ensure construction safety. Especially in railway tunnel projects with complex mountainous terrain, the role of the trolley is particularly important
Highway tunnel: Whether it is the construction of highway tunnels or ordinary highway tunnels, the tunnel arch installation trolley can assist in completing the arch installation work, improving construction efficiency and quality
Urban underground pipe gallery: In the construction of urban underground pipe galleries, trolleys are used to install arches to enhance the stability of the structure, and are suitable for construction in deeper underground spaces
Mining tunnels: In the construction of metal mines and coal mine tunnels, tunnel arch installation trolleys are used to strengthen support, control surrounding rock deformation, and ensure construction safety.
 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Changsha Potency Mechanical Technology Co., Ltd.
Location No.3358 Jinyang Avenue, Liuyang Economic and Technological Development Zone, Changsha City, Hunan Province, China
Contact Person Selina

Request A Quote

Please check your email address.
Your message must be at least 20 characters.