YUHONG HOLDING GROUP CO., LTD
                                                                                                           
Verified Supplier
36 Years
Since 1990
Menu

ASME VIII Shell & Tube Heat Exchanger TEMA AEU U Tube Bundle with Tubesheet for Oil & Gas

Price Negotiable
Price: Depend on drawing
MOQ: 1 SET
Delivery Time: 20-80 days
Brand: YUHONG
Product Description

ASME VIII Shell & Tube Heat Exchanger TEMA AEU U Tube Bundle with Tubesheet for Oil & Gas

The SAMA-T24-V6U is a high-performance, horizontal shell and tube heat exchanger specifically engineered for demanding industrial processes. Designed under the TEMA AEU classification and GB/T 151-2014 Grade I standards, this unit offers exceptional thermal efficiency and structural integrity.

 

Components Summary Table

Component Specification / Standard
Shell 16" OD (406.4 mm), 12 mm Nominal Thickness, SS316L
Nozzles 3-inch Seamless SS316L (Shell & Tube side)
Fasteners ASTM A193 Gr B8M Cl.2 Studs / A194 Gr 8M Nuts
Finish Wetted surfaces Ra 3.2
Mounting Bolt-on SS316L shoulders with 3 mm non-metallic isolation pads

 

Critical Welding & Assembly Specifications

Material Handling & Non-Destructive Examination (NDE)

  • Material Integrity: All wetted parts and welding consumables must be compatible with SS316L (022Cr17Ni12Mo2).

  • Sequence of Inspection: 1. Perform 100% Liquid Penetrant Testing (PT) after the initial strength weld. 2. Repeat 100% PT after hydraulic expansion to verify that no micro-cracking occurred during the expansion process.

  • Final Non-Destructive Examination: All pressure-retaining welds require 100% Liquid Penetrant Testing (PT).

Post-Weld Treatment

  • Chemical Cleaning: The entire unit must undergo complete Pickling & Passivation after final fabrication is complete.

  • Surface Roughness: All wetted surfaces must maintain a finish of Ra3.2.

  • Zero Dead Leg: Vent and drain nozzles must be configured with blind flanges to ensure a "Zero Dead Leg" design.

Testing, Inspection & Preservation

  • NDE: 100% Liquid Penetrant Testing (PT) for all pressure-retaining welds.

  • Leak Testing: Pneumatic bubble leak test at 1.7 bar held for 30 minutes.

  • Chemical Treatment: Full pickling and passivation of the entire unit.

  • Preservation: Internal cavities dried to a -40C dew point and pressurized with a 0.5 bar nitrogen blanket.​

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company YUHONG HOLDING GROUP CO., LTD
Location 20 Floor, No.1 New World Building, NO.1018 Min'an Road, Yinzhou District, Ningbo, China, ZIP:315040
Contact Person Equipment Dept.

Request A Quote

Please check your email address.
Your message must be at least 20 characters.