YUHONG HOLDING GROUP CO., LTD
                                                                                                           
Verified Supplier
36 Years
Since 1990
Menu

TEMA Type AEU Shell and Tube Heat Exchanger BPVC Section VIII Div.1 for Oil and Gas Industry

Price Negotiable
Price: Depend on drawing
MOQ: 1 SET
Delivery Time: 20-80 days
Brand: YUHONG
Product Description

TEMA Type AEU Shell and Tube Heat Exchanger BPVC Section VIII Div.1 for Oil and Gas Industry

The SAMA-T24-V6U is a high-performance, horizontal shell and tube heat exchanger specifically engineered for demanding industrial processes. Designed under the TEMA AEU classification and GB/T 151-2014 Grade I standards, this unit offers exceptional thermal efficiency and structural integrity.

 

Components Summary Table

Component Specification / Standard
Shell 16" OD (406.4 mm), 12 mm Nominal Thickness, SS316L
Nozzles 3-inch Seamless SS316L (Shell & Tube side)
Fasteners ASTM A193 Gr B8M Cl.2 Studs / A194 Gr 8M Nuts
Finish Wetted surfaces Ra 3.2
Mounting Bolt-on SS316L shoulders with 3 mm non-metallic isolation pads

 

Critical Welding & Assembly Specifications

Material Handling & Non-Destructive Examination (NDE)

  • Material Integrity: All wetted parts and welding consumables must be compatible with SS316L (022Cr17Ni12Mo2).

  • Sequence of Inspection: 1. Perform 100% Liquid Penetrant Testing (PT) after the initial strength weld. 2. Repeat 100% PT after hydraulic expansion to verify that no micro-cracking occurred during the expansion process.

  • Final Non-Destructive Examination: All pressure-retaining welds require 100% Liquid Penetrant Testing (PT).

Post-Weld Treatment

  • Chemical Cleaning: The entire unit must undergo complete Pickling & Passivation after final fabrication is complete.

  • Surface Roughness: All wetted surfaces must maintain a finish of Ra3.2.

  • Zero Dead Leg: Vent and drain nozzles must be configured with blind flanges to ensure a "Zero Dead Leg" design.

Testing, Inspection & Preservation

  • NDE: 100% Liquid Penetrant Testing (PT) for all pressure-retaining welds.

  • Leak Testing: Pneumatic bubble leak test at 1.7 bar held for 30 minutes.

  • Chemical Treatment: Full pickling and passivation of the entire unit.

  • Preservation: Internal cavities dried to a -40C dew point and pressurized with a 0.5 bar nitrogen blanket.​

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company YUHONG HOLDING GROUP CO., LTD
Location 20 Floor, No.1 New World Building, NO.1018 Min'an Road, Yinzhou District, Ningbo, China, ZIP:315040
Contact Person Equipment Dept. (Marketing Director)

Request A Quote

Please check your email address.
Your message must be at least 20 characters.