YUHONG HOLDING GROUP CO., LTD
                                                                                                           
Verified Supplier
36 Years
Since 1990
Menu

ASME Certificated Shell And Tube Type Heat Exchanger Reformed Gas Boiler for Fertilizer Plant

Price Negotiable
Price: 1--1000000 USD
MOQ: 1Set
Delivery Time: 45---150 DAYS
Brand: YUHONG
Product Description

ASME Certificated Shell And Tube Type Heat Exchanger Reformed Gas Boiler for Fertilizer Plant

YUHONG GROUP is a leading international manufacturer and technical service provider specializing in high-performance Heat Exchangers and ASME Pressure Vessels. With decades of industrial expertise, we deliver critical components—including tubesheets, air coolers, and complex pressure-retaining units—to the world’s most demanding sectors.

 

Design & Dimensions

  • Reference Drawings: For general assembly and design data.

  • Orientation: All bolt holes must straddle the normal center lines of the vessel.

  • Units: All dimensions are in mm unless otherwise specified.

  • Gasket Surfaces: All R.F. (Raised Face) gasket contact surfaces shall comply with ASME B16.5.

  • Edges: All accessible sharp corners and inside edges of nozzles/connections must be rounded to a smooth radius (minimum 3mm for nozzle interiors).

MATERIAL

8501: TUBES / 34 OD x 4.5 Thk (MIN), SA-213 Gr.22 (SEAMLESS)

8452: HEX. NUT M24 x 3P, SS 304

8451: HEX. HD BOLT M24 x 3P x 85 LG., SS 304

8116: KNUCKLE FORGING, SA-336 Gr.22

8002: CHANNEL DISHEND, SA-387-GR 11 CL.2

2201: HYDROTEST DISHEND, SA-516-GR-70

11: HYDRO. RING 40 THK., SA-387-GR 11 CL.2

10: BAFFLE SUPPORT CLEAT 22 THK., SA-387 GR 11 CL.2

9: BY PASS PIPE 8 NB SCH 160, SA-335 Gr.22 (SEAMLESS)

8: INLET CHANNEL CONE-2 40 Thk, SA-387-GR 11-CL 2

7: INLET CHANNEL CONE-1 40 Thk, SA-387-GR 11-CL 2

6: STUB PIECE 24 THK, SA-387-GR-11-CL-2

5: OUTLET CHANNEL 30 Thk, SA-387-GR 11-CL 2

4: INLET CHANNEL 40 Thk, SA-387-GR 11-CL 2

3: SHELL COURSE 3 69 Thk, SA-387-GR 11-CL 2

2: SHELL COURSE 2 69 Thk, SA-387-GR 11-CL 2

1: SHELL COURSE 1 69 Thk, SA-387-GR 11-CL 2

 

Inspection & NDT (Non-Destructive Testing)

  • Radiographic Examination (RT): * 100% RT for all pressure butt-welds

  • Ultrasonic Examination (UT): All pressure-retaining butt welds and nozzle attachments shall be fully examined per ASME Sec. VIII, Div. 1 (UW53 & Appendix 12).

  • Magnetic Particle Examination (MT): * Required for all welded joints of low alloy steel and lifting lugs per App. 6 of ASME Sec. VIII Div. 1

Hydro​static Test

  • Medium: Clean potable water

  • Duration: Maintain test pressure for at least one hour per 25mm of total nominal shell thickness.

  • Sequence: No painting is permitted before the hydrotest, leak test, and weld inspections are approved.

  • Post-Test: Equipment must be cleaned thoroughly to remove scales and foreign materials.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company YUHONG HOLDING GROUP CO., LTD
Location 20 Floor, No.1 New World Building, NO.1018 Min'an Road, Yinzhou District, Ningbo, China, ZIP:315040
Contact Person Equipment Dept. (Marketing Director)

Request A Quote

Please check your email address.
Your message must be at least 20 characters.