YUHONG HOLDING GROUP CO., LTD
                                                                                                           
Verified Supplier
36 Years
Since 1990
Menu

API 661 Forced Draft Air Cooled Exchanger Optimal Flow Cooling for Power Plant

Price Negotiable
Price: Negotiable
MOQ: 1 SET
Delivery Time: 45-150days
Brand: Yuhong
Product Description

API 661 Forced Draft Air Cooled Exchanger Optimal Flow Cooling for Power Plant

 

Product Description
Standard Compliance: Fully certified under API 661 and ASME Section VIII Division 1.

Core Materials: SA213-TP316L stainless steel or seamless carbon steel with bimetallic aluminum high-fins.

Key Benefits: Eliminates 100% of process water consumption and mitigates cyclic thermal stress.

Structure: Heavy-duty modular A-frame or horizontal configuration for continuous 24/7 operation.

 

API 661 Forced Draft Air Cooler for 300MW Desert Power Plant
 

Process Challenges & Requirements
Extreme Location: Project based in an arid Middle Eastern desert with ambient temperatures reaching 52°C.

Zero Water Policy: Severe water scarcity prohibited the use of traditional water-cooled towers or evaporative systems.

Thermal Shock: Primary loop fluid entered at 180°C, creating severe risk of thermal fatigue cracking at the joints.

 

Advantage

Engineering Solution: Forced Draft 
Ground-Level Access: Fans and mechanical drives are mounted at the bottom, enabling safe, platform-free maintenance during continuous operation.

Extended Motor Life: Moving components operate strictly in the cool, ambient incoming airstream, protecting electrical insulation from high-temperature exhaust.

 

Parametric Technical Specifications
Certifications: Formally stamped with ASME "U" Certification and engineered to API 661 parameters.

Robotic Tube Jointing: Tubesheet joints feature robotic seal welding combined with strength expansion, zero-leakage verified under 15 MPa hydrostatic pressure.

Stress Relief (PWHT): Thick-wall header plate cutouts processed via 18-meter precision laser cutters, followed by mandatory Post-Weld Heat Treatment to eliminate residual stresses.

 

Operational Outcomes
Water Conservation: Saves over 100 metric tons of process water per hour with zero chemical discharge penalties.

Optimal Flow Distribution: Computerized aerodynamic modeling restricted airflow velocity variance across the bundle face to under 5%, stabilizing turbine backpressure even during peak solar radiation.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company YUHONG HOLDING GROUP CO., LTD
Location 20 Floor, No.1 New World Building, NO.1018 Min'an Road, Yinzhou District, Ningbo, China, ZIP:315040
Contact Person Equipment Dept. (Marketing Director)

Request A Quote

Please check your email address.
Your message must be at least 20 characters.