Heavy Impact Testing Machine for Batteries with 0-1000mm Adjustable Height and PLC Touch Screen Control

Price Negotiable
Price: negotiate
MOQ: 1 set
Delivery Time: 7-15 work days
Brand: Neide
Product Description
Product Overview

This heavy impact testing machine for batteries meets stringent quality inspection requirements by accurately simulating extreme impact scenarios to evaluate battery performance in complex environments.

Key Features
  • Advanced design and manufacturing techniques ensure test data accuracy and reliability
  • High-efficiency impact system reduces testing cycles and boosts productivity
  • Durable construction guarantees stable operation and reduces maintenance costs
  • Helps identify potential defects, optimize designs, and enhance battery safety
Technical Specifications
AttributeValue
Pressure fluctuation≤5%
PowerElectronic
Warranty1 Year
Impact Height0-1000mm (Adjustable)
Displacement Accuracy≤±5mm
Impact Floor MaterialNo. 45 Steel, 30mm thickness
Metal Rod15.8±0.2mm (5/8 inch) Steel Rod
Power SupplyAC220V; 50Hz/60Hz
BrandNeide
CustomizationAvailable
Detailed Parameters
ParameterValue
Inner Box Size (W*D*H)490*520*1430mm
Equipment Dimensions (W*D*H)700*1000*1720mm
Weight9.1kg and 10kg
Control ModePLC Touch Screen Control
Internal Material1.2mm SUS#304 Stainless Steel Plate
External Material1.5mm Thick Cold-rolled Steel Plate
Equipment Weight85Kg
Heavy impact testing machine for batteries showing industrial testing equipment design
Related Products
Frequently Asked Questions
How long does temperature recovery take after rapid high-low temperature switching?
The battery thermal shock test chamber typically recovers to set temperature within 1-2 minutes after switching, thanks to its efficient refrigeration/heating system and insulated chamber design. This rapid recovery accurately simulates real-world temperature changes for reliable battery performance evaluation.
How can these devices shorten product R&D cycles?
These testing devices can significantly reduce R&D time by quickly identifying design flaws under extreme conditions. What might take months of field monitoring can now be accomplished in days, potentially cutting development cycles from a year to about six months.
What are the maintenance requirements and costs?
Maintenance involves simple operations like condenser cleaning and sensor calibration. Annual maintenance costs typically represent 6-10% of equipment cost, covering replacement of high-quality components designed for long service life.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Dongguan Neide Technology Co., Ltd
Location No. 13, Shihuan Road, Dongcheng Sub-district, Dongguan City, Guangdong Province
Contact Person Coco

Request A Quote

Please check your email address.
Your message must be at least 20 characters.