Mining Hydraulic Breaker Hammer Cement Asphalt Pavement Crushing Mine Tunnel Demolition
Excavator Hydraulic Breaker Hammer Cement Asphalt Pavement Crushing Mine Tunnel Demolition Mining Hydraulic Hammer TALRUS-165S
Products Description
Hydraulic breaker used in secondary crushing in mining areas, completely replacing secondary blasting for large block crushing. can also be used for mining, crushing and demolition operations in metallurgy, mining, railways, highways, construction and other fields.
| item | value |
| Applicable Industries | Machinery Repair Shops, Retail, Energy & Mining, Construction works |
| Video outgoing-inspection | Provided |
| Machinery Test Report | Provided |
| Marketing Type | Hot Product 2024 |
| Place of Origin | China |
| Warranty | 1 year |
| Condition | New |
| Brand Name | PHX |
| Application | Excavator Spare Parts |
| Part name | breaker hammer |
| Condition | New100% |
| MOQ | 1 Piece |
1. Using high quality wear resistant raw material. Less faults, easy to repair and maintain.
2. Advanced heat treatment technology,
greatly enhanced heat resistance and abrasion resistance of the product.
3. High quality breaker parts, durable and wear, longer lifetime compare to general breakers in market.
4. Strong impact system, high energy and impact frequency.
Our team
We are a professional team. Our members have many years of excavator attachments manufacturing background, and are the backbone of domestic well-known construction machinery manufacturing companies.
We are a dedicated team. We firmly believe that a safe brand comes from the trust of our customers. Only by focusing can we make a good product.
We are a team with dreams. We come from all over the world because of a common dream: to be a truly excellent excavator front-end attachments company, providing customers with the most reliable attachments.
FAQ
1: When will ship my order ?
Once we get confirmation of payment, we will try the best to ship order within 24 hours
2: How long to prepared the goods?
We have many stock for each iterm. so dont woride .we have enought stock for u
3: Which shipment you can supply?
By sea, by air or by express (DHL, FEDEX ,TNT,UPS,EMS)
4.How long does it take to clients address ?
The normal delivery time is 4-5 days .depending one which country u are in
5.How can i know my order it already shipping ?
When the goods shipping , i will email u for tracking number for goods. if by sea or by air , i can offer bill of lading to u
6.If i was not satisfied with the products, can i return goods ?
Yes . we offer exchanged and repair serve in the warranty time . please contact us before u return
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.




