OEM Customized Configurations Non-Alloy Stainless Steel Welded Pipe with 2B 2D BA 2BB No.3 No.4 Surface Finish
Price:
CN¥3,562.06/tons 5-49 tons
MOQ:
5 tons
Delivery Time:
8-14 days
Product Description

Item | stainless steel pipe | ||
Steel grade | 300 series | ||
Standard | ASTM A213,A312,ASTM A269,ASTM A778,ASTM A789,DIN 17456, DIN17457, DIN 17459,JIS G3459,JIS G3463,GOST9941,EN10216, BS3605,GB13296 | ||
Material | 304,304L,309S,310S,316,316Ti,317,317L,321,347,347H,304N,316L, 316N,201,202 | ||
Surface | Polishing,annealing,pickling,bright | ||
Size | Wall thickness | 1mm-150mm | |
Outer diameter | 6mm-2500mm | ||
Package | Standard export seaworthy package,or as required. | ||
Application | It is widely used in the fields of petroleum, food, chemical industry, construction, electric power, nuclear energy,energy,machinery, biology, papermaking, shipbuilding and boilers. Pipes can also be made according to customer requirements. | ||
Contact | If you have any questions,please feel free to contact me. | ||









Q:What are the shipping ports?
A:You can choose other ports according to your needs.
Q:About product prices?
A:Prices vary from period to period due to cyclical changes in the price of raw materials.
Q:What are the certifications for your products?
A:We have ISO 9001,EWC and other certifications.
Q:How long does your delivery time take?
A:In general, our delivery time is within 7-45 days, and may be delayed if the demand is
extremely large or special circumstances occur.
Q:Can I go to your factory to visit?
A:Of course, we welcome customers from all over the world to visit our factory.
Q:Does the product have quality inspection before loading?
A:Of course, all our products are strictly tested for quality before packaging.
Q:What is your working time?
A:In general, our online service time is: 9:00-22:00, after 22:00, we will reply to your
inquiry during the next working day.
Q:About product prices?
A:Prices vary from period to period due to cyclical changes in the price of raw materials.
Q:What are the certifications for your products?
A:We have ISO 9001,EWC and other certifications.
Q:How long does your delivery time take?
A:In general, our delivery time is within 7-45 days, and may be delayed if the demand is
extremely large or special circumstances occur.
Q:Can I go to your factory to visit?
A:Of course, we welcome customers from all over the world to visit our factory.
Q:Does the product have quality inspection before loading?
A:Of course, all our products are strictly tested for quality before packaging.
Q:What is your working time?
A:In general, our online service time is: 9:00-22:00, after 22:00, we will reply to your
inquiry during the next working day.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
SHANDONG JIUHAO STEEL CO.,LTD
Location
Xingguang International Financial Center, Liaocheng City, Shandong Province
Contact Person
Gavin