Q 355B Prefabricated Steel Bailey Bridge Economic Steel Concrete Bridge
Price:
1000USD ~ 2000USD Per ton
MOQ:
negotiation
Delivery Time:
negotiation
Brand:
EVERCROSS
Product Description
Q 355B Prefabricated Steel Bailey Bridge Economic Steel Concrete Bridge
Product Specifications
| Attribute | Value |
|---|---|
| Product Name | Bailey Bridge |
| Steel | S355JR, S355J0, S460J0, ASTM Gr65, Gr50, etc |
| Type | CB100, CB200 |
| Deck | Steel Deck |
| Standard | AASHTO, BS5400, AS5100, IRC, etc |
| Annual output | 100,000 Tons |
Product Description
Prefabricated Steel Bailey Bridge Fast-Installed And Economic
Bailey Bridges are portable steel bridges that have been widely used in various fields. Their most important features include:
- Ability to achieve various spans and bearing capacities
- Lightweight and handy components
- Easy to dismantle with strong adaptability
- Can be quickly completed with simple tools and manpower
Surface protection options include paint or hot-dip galvanized coating.
Technical Specifications
| Single lane: | Standard roadway: 3.15m / 4.2m Single lane: 30ft-200ft |
| Double lane: | Standard roadway:7.35m Double lane:30ft-180ft |
| Load: | Design according to different requirements |
| Deck: | Steel deck |
| Bridge type: | CB100, CB200 |
Bridge Introduction
Bailey Bridge is a standard bridge equipment, adopted extensively and the most popular in the world.
Competitive Advantages
- Heavy loading capacity
- Great stability
- Long fatigue life
- Light weight
- Low cost
- Easy and fast erection
Key Features
- Simple structure design
- Convenient transport and speedy erection
- Easy disassembling
- Capable of alternative spans and loading capacities
- High strength and big stiffness relative to concrete bridges
- Uniform material quality and modulus of elasticity
- Prefabricated in factory with site assembly using pins and bolts
- Short construction period not affected by seasonal effects
- Suitable for industrialized manufacture and easy transport
- Easy to repair and replace with long lifetime
- Materials can be recycled
Applications
The Bailey bridge has been widely used in various applications, both in military and civilian contexts:
- Military bridging operations
- Emergency response and disaster relief
- Temporary bridges, emergency bridges and fixed bridges
- Suspension bridges of varied span
Evercross Steel Bridges Overview
| EVERCROSS STEEL BRIDGE | Bailey bridge (Compact-200, Compact-100, LSB, PB100, China-321, BSB) Modular bridge (GWD, Delta, 450-type, etc.), Truss Bridge, Warren bridge, Arch bridge, Plate bridge, Beam bridge, Box girder bridge, Suspension bridge, Cable-stayed bridge, Floating bridge, etc. |
| DESIGN SPANS | 10M TO 300M Single span |
| CARRIAGE WAY | SINGLE LANE, DOUBLE LANES, MULTILANE, WALKWAY, ETC |
| LOADING CAPACITY | AASHTO HL93.HS15-44, HS20-44, HS25-44, BS5400 HA+20HB, HA+30HB, AS5100 Truck-T44, IRC 70R Class A/B, NATO STANAG MLC80/MLC110. Truck-60T, Trailer-80/100Ton, etc. |
| STEEL GRADE | EN10025 S355JR S355J0/EN10219 S460J0/EN10113 S460N/ BS4360 Grade 55CAS/NZS3678/3679/1163/Grade 350, ASTM A572/A572M GR50/GR65GB1591 GB355B/C/D/460C, etc. |
| CERTIFICATES | ISO9001, ISO14001, ISO45001, EN1090, CIDB, COC, PVOC, SONCAP, etc. |
| WELDING | AWS D1.1/AWS D1.5AS/NZS 1554 or equivalent |
| BOLTS | ISO898, AS/NZS1252, BS3692 or equivalent |
| GALVANIZATION CODE | ISO1461AS/NZS 4680ASTM-A123,BS1706or equivalent |
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
EVERCROSS BRIDGE TECHNOLOGY (SHANGHAI) CO.,LTD.
Location
10th Floor, Building 1, No. 188 Changyi Road, Baoshan District, Shanghai,China
Contact Person
Libby Chen