EVERCROSS BRIDGE TECHNOLOGY (SHANGHAI) CO.,LTD.
                                                                                                           
Verified Supplier
21 Years
Since 2005
Menu

Military Prefabricated Compact Bailey Bridge Q355B / Q235B Universal

Price Negotiable
Price: 1000USD ~ 2000USD Per ton
MOQ: negotiation
Delivery Time: negotiation
Brand: EVERCROSS
Product Description
Military Prefabricated Compact Bailey Bridge Q355B / Q235B Universal
Product Specifications
Attribute Value
Product Name Bailey Bridge
Steel S355JR, S355J0, S460J0, ASTM Gr65, Gr50, etc
Type CB100, CB200
Deck Steel Deck
Standard AASHTO, BS5400, AS5100, IRC, etc
Annual output 100,000 Tons
Product Overview

The Bailey Bridge is a prefabricated steel bridge system characterized by lightweight components, easy assembly/disassembly, and strong adaptability. Originally developed for military use, it can now be rapidly deployed for various applications including disaster relief, civil engineering projects, and temporary crossings.

Compact Bailey Bridge structure showing modular steel components
Technical Specifications
Single lane: Standard roadway: 3.15m / 4.2m | Span: 30ft-200ft
Double lane: Standard roadway: 7.35m | Span: 30ft-180ft
Load capacity: Custom designed to requirements
Deck type: Steel deck
Bridge types: CB100, CB200
Key Applications
  • Military Operations: Temporary crossings and logistics support in combat zones
  • Disaster Relief: Emergency access and humanitarian aid routes
  • Civil Engineering: Temporary bridges for construction sites
Competitive Advantages
  • Rapid Deployment: Quick assembly with simple tools and manpower
  • Portability: Modular design for easy transportation
  • Cost-Effectiveness: Lower construction costs than traditional bridges
  • Flexibility: Configurable for different spans and load requirements
Technical Data
Configuration Allowable Bending Moment [M] (kN*m) Allowable Shear Force [Q] (kN) High-shear Union Allowable Shear Force [Q]H (kN)
SS 1127 257 348
SSR 2254 257 348
DS 2525 514 696
DSR1 3381 514 696
DSR2 5050 514 696
TS 3800 771 1044
TSR2 5635 771 1044
TSR3 7600 771 1044
Deployed Bailey Bridge in operational environment showing full structure
Additional Features
  • Heavy loading capacity with long fatigue life
  • Simple structure with great stability
  • No special tools required for construction
  • Components small enough for manual transport

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company EVERCROSS BRIDGE TECHNOLOGY (SHANGHAI) CO.,LTD.
Location 10th Floor, Building 1, No. 188 Changyi Road, Baoshan District, Shanghai,China
Contact Person Libby Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.