Prefab Steel Warehouse with Glass Wool Panels
| Material | Steel |
| Window | PVC, Aluminum Windows |
| Resistance | Corrosion, Fire, Termites |
| Toughness | Good Toughness |
| Typical Model | Single Span, Multi Span |
| Highlight | Painted Steel Structure Warehouse |
| Installation | Fast |
| Product Usage | Building Construction |
| Product Material | Steel Structure |
| Cost | Affordable |
| Technique | Hot Rolled |
| Steel Grade | Q235B Q345b Low Carbon Steel |
| Versatility | Flexible |
- Attractive design with beautiful and elegant appearance using color steel sandwich panels
- Lightweight construction for convenient shipping and handling
- Easy assembly and dismantling with simple tools (plugs and screws)
- Sturdy steel frame structure with sandwich panels for durability
- Completely waterproof construction
- Customizable roof, wall, doors, and windows to meet specific requirements
- Long-lasting anti-corrosion coating on steel frame parts for 50+ years of service
Light Frame Steel Construction Hangar Design Prefabricated Steel Structure Factory Building Workshop warehouse.
A pre-engineered steel building is a modern technology where the complete designing is done at the factory and the building components are brought to the site and then fixed/jointed at the site, all is bolt connection, no need any welding!
An efficiently designed pre-engineered building can be lighter than the conventional steel buildings by up to 30%. Lighter weight equates to less steel and potential price savings in structural framework.
| Component | Specification |
|---|---|
| Main Structure - Column | Q355/Q235 H-steel, Box column available |
| Main Structure - Rafter, Beam | Q355/Q235 H-steel |
| Surface Processing Options | 1. Epoxy zinc-rich primer + epoxy mica intermediate paint (120 μm thickness) 2. Hot dip galvanization |
| Sub Structure - Purlin | Q355B, C/Z steel section, galvanization 275g/m² |
| Sub Structure - Angle brace | Q235B, L-steel |
| Sub Structure - Cross bracing | Q235B round bar, L-steel |
| Sub Structure - Tie bar | Q235B, round pipe |
| Sub Structure - Batter brace | Q235B, round bar |
| Roof System - Panel Options | 1. Insulated sandwich panel (PU, rock wool, glass fiber, EPS) with steel sheets (50mm/75mm/100mm thickness) 2. Steel plate (0.4mm/0.5mm thickness) |
| Wall System - Panel Options | 1. Insulated sandwich panel (PU, rock wool, glass fiber, EPS) with steel sheets (50mm/75mm/100mm thickness) 2. Steel plate (0.4mm/0.5mm thickness) 3. Brick wall (provided by client) |
For the main steel structure, the derust grade is ball blasting Sa 2.5, and manual derust St2.0 on secondary steel structure.
We provide detailed construction drawings as a manual to guide you through the building erection and installation process step by step.
Portal frame is widely used for industrial workshops, office buildings, shopping malls and warehouses. Other types can be designed and manufactured according to customer requirements.
Painting touch-ups should be done after frame installation to ensure the surface remains protected for extended periods.
| 1 | Location (where will be built?) | _____country, area |
| 2 | Size: length*width*height | _____mm*_____mm*_____mm |
| 3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
| 4 | snow load (max. snow height) | _____kn/m2, _____mm |
| 5 | anti-earthquake | _____level |
| 6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
| 7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
| 8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
| 9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
| 10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.