Prefabricated Steel Pedestrian Bridges with 35-50 Day Lead Time and SA2.0~2.5 Shot Blasting Standard
Steel structure bridges provide exceptional mechanical performance, advanced construction techniques, and aesthetic appeal for spanning rivers, lakes, and urban areas. These permanent infrastructure solutions facilitate regional economic development and transportation connectivity.
| Parameter | Specification |
|---|---|
| Scale | Large Bridge |
| Material | Steel Bridge |
| Life Span | Permanent Bridge |
| Surface Treatment | Shot Blasting, Galvanized or Painted |
| Shot Blasting Standard | SA2.0~2.5 |
| Welding | Continuous Weld Full Length |
| Lead Time | 35-50 Days |
| Dimensions | Customizable L*W*H |
- High Strength & Lightweight: Steel offers superior strength-to-weight ratio compared to concrete and wood, enabling greater load capacity with reduced foundation requirements
- Rapid Construction: Factory-prefabricated components ensure quality control and reduce on-site assembly time by 35-50 days
- Minimal Traffic Disruption: Pre-assembled components reduce construction site safety risks and traffic interference
Urban transportation infrastructure including road bridges, overpasses, and pedestrian crossings. These steel structures efficiently connect urban areas, alleviate traffic congestion, and provide safe pedestrian pathways.
Shandong Chentai Heavy Steel Construction Group - Established in 2004, operating from a 300,000 square meter facility with annual production capacity of 200,000 tons of steel structures. Equipped with 30 production lines and supported by 500+ employees including 100+ professional designers.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.