Quick Bolt Assemble Multi-storey Steel Building for Fast Construction Schedule
Price:
USD 30-60 / Square Meter
MOQ:
1000 Square Meters
Delivery Time:
3-5 Weeks
Brand:
CT Steel Structure
Product Description
Quick Bolt Assemble Multi-storey Steel Building for Fast Construction Schedule
CT Steel Structure is a professional manufacturer and exporter of prefabricated steel structure buildings in China. Our company's full series prefabricated steel structure products cover logistics warehouses, industrial production workshops, multi-story comprehensive buildings, agricultural greenhouses, farm breeding houses, vehicle parking canopies and commercial exhibition malls.
All products adopt high-strength Q355B steel raw material, factory prefabricated modular production, with the advantages of fast construction, low comprehensive cost, strong anti-seismic & anti-corrosion performance, flexible disassembly and recyclability.
We persist in providing one-stop full-chain service from drawing design, precision production to cross-border installation guidance for global buyers, support personalized size, load standard, appearance and brand customization. Whether small-area single buildings or large-scale industrial & commercial complex projects over tens of thousands square meters, we can deliver stable, durable and cost-effective steel structure building solutions to meet different storage, manufacturing, planting, breeding and commercial operation demands worldwide.
Technical Specifications
| Component | Detailed Specifications |
|---|---|
| Primary Frame | Welded H-section Steel / Hot-rolled Steel (ASTM A36 or S235JR equivalent) |
| Surface Treatment | Hot-dip Galvanized (Min. 600g/m²) or Premium Anti-corrosion Painting |
| Roof & Wall Panels | Sandwich Panels (Rock Wool/PU/EPS) or Single Corrugated Steel Sheets |
| Design Standards | GB/T, AISC, Eurocode, or Local Building Codes Compliance |
Key Advantages
- Prefabricated 2-5 storey steel office buildings for enterprise headquarters, industrial park independent offices and factory supporting office spaces
- Main frame adopts high-strength Q355B H-beams matched with composite floor slabs to stably bear multi-layer office live loads
- Large-area glass curtain walls and thermal-insulated aluminum windows deliver high daylighting rate and bright, comfortable working environment
- Bolt-connected modular structure eliminates massive on-site welding and greatly shortens the whole construction cycle
- We provide one-stop full-chain services covering design, production and overseas installation guidance
The structural system achieves Grade 8 seismic resistance, ideal for regions prone to earthquakes. Surface shot blasting treatment together with multi-coat anti-corrosion paint extends the service lifespan. Beam dimensions are reasonably designed to secure ample clear height on every floor. We deliver complete one-stop services covering design, manufacturing and overseas erection guidance. Our engineers can coordinate with local surveyors to facilitate project acceptance procedures.
Primary Applications
- Industrial: Logistics warehouses and manufacturing plants
- Commercial: Shopping malls and automobile showrooms
- Agricultural: Large-span poultry houses and grain storage
Frequently Asked Questions
How long does it take to deliver a steel structure building?
Generally, the production cycle is 30-45 days after the design is finalized. Shipping time depends on the destination port, typically ranging from 15 to 40 days.
Can your steel buildings be customized to specific local building codes?
Yes, our engineering team can design the structure to meet specific local wind speeds, snow loads, and seismic requirements according to international standards.
What maintenance is required for a steel structure?
Steel buildings require very low maintenance. Periodic inspections of the paint or galvanized coating and clearing of roof gutters are usually sufficient to ensure a lifespan of over 50 years.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
China CT Steelstructure Co.,Ltd
Location
Household 1003, Building 3, No. 176 Jufeng Road, Licang District, Qingdao City, Shandong Province, China
Contact Person
David