Jiangsu Zhonghai Bridge Equipment Co.,LTD
                                                                                                           
Verified Supplier
12 Years
Since 2014
Menu

CB200 Modular Steel Bridge Truss System with 843.9 kN Load Capacity and Galvanized Surface

Price Negotiable
Price: USD 95-450
MOQ: 1 Pcs
Delivery Time: 8-10 work days
Brand: Zhonghai Bailey Bridge
Product Description
Product Overview
Our modular steel bridge system features a prefabricated galvanized surface for superior corrosion resistance and long-term durability. The simple truss design ensures rapid deployment and reliable performance in various applications.
Assembly Time & Efficiency
Bailey bridges are renowned for their modular design and rapid assembly capabilities, with construction times varying based on project requirements:
  • Short Single-Tier Bridge: 3-4 hours under ideal conditions
  • Standard Bridge: 24-48 hours for typical installations
  • Complex Structures: Extended timelines for specialized projects
Key Assembly Factors
  • Bridge size and complexity (panel count, truss configuration)
  • Weather conditions and site accessibility
  • Workforce size (typically 40 skilled workers)
  • Site preparation requirements
Technical Specifications
CB200 Truss Press Limited Table
NO. Internal Force Structure Form Not Reinforced Model Reinforced Model
200 Standard Truss Moment (kN.m) SS: 1034.3
DS: 2027.2
TS: 2978.8
QS: 3930.3
SSR: 2165.4
DSR: 4244.2
TSR: 6236.4
QSR: 8228.6
200 Standard Truss Shear (kN) SS: 222.1
DS: 435.3
TS: 639.6
QS: 843.9
SSR: 222.1
DSR: 435.3
TSR: 639.6
QSR: 843.9
CB200 Geometric Characteristics (Half Bridge)
Structure Geometric Characteristics Chord Area (cm²) Section Properties (cm³) Moment of Inertia (cm⁴)
SS SS 25.48 5437 580174
SSR SSR 50.96 10875 1160348
CB321(100) Truss Press Limited Table
No. Internal Force Structure Form Not Reinforced Model Reinforced Model
321(100) Standard Truss Moment (kN.m) SS: 788.2
DS: 1576.4
TS: 2246.4
DDR: 3265.4
SSR: 1687.5
DSR: 3375
TSR: 4809.4
DDR: 6750
Key Advantages
  • Simple structure design for easy implementation
  • Convenient transportation and handling
  • Rapid erection capabilities
  • Easy disassembly and reconfiguration
  • Heavy loading capacity up to 843.9 kN
  • Exceptional stability and long fatigue life
  • Flexible alternative span configurations
  • Multiple loading capacity options
Product Images
CB200 modular steel bridge truss system with galvanized surface Industrial steel bridge installation showing truss assembly and structural components

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiangsu Zhonghai Bridge Equipment Co.,LTD
Location No. 83, Dantu New City Section, Speech Highway, Dantu District, Zhenjiang, Jiangsu, China
Contact Person Lanny

Request A Quote

Please check your email address.
Your message must be at least 20 characters.