Modular Panel Bridge TSR Structure - 4809.4 kN.m Moment Capacity, 698.9 kN Shear Force for Construction Equipment
Price:
USD 95-450
MOQ:
1 Pcs
Delivery Time:
8-10 work days
Brand:
Zhonghai Bailey Bridge
Product Description
Product Overview
Modular panel bridges designed for rapid deployment in construction and emergency scenarios. These compact panel bridges feature the proven TSR structure system for exceptional load capacity and stability.
Rapid Construction Capabilities
Real-World Deployment Examples
- July 2016: 200-meter bridge construction completed in 18 hours 35 minutes for emergency rescue operations
- 2015/2016 drills: 12-meter span, 3.75-meter width bridge erected in just 1.5 hours
Theoretical Performance
Skilled operators can typically complete construction of 30-meter single-span bridges within 6-12 hours, depending on complexity and conditions.
Technical Specifications
CB321(100) Truss Performance Data
| Type No. | Internal Force | Structure Form | Not Reinforced Model | Reinforced Model |
|---|---|---|---|---|
| 321(100) | Standard Truss Moment (kN.m) | SS: 788.2 DS: 1576.4 TS: 2246.4 DDR: 3265.4 |
SSR: 1687.5 DSR: 3375 TSR: 4809.4 DDR: 6750 |
|
| Standard Truss Shear (kN) | SS: 245.2 DS: 490.5 TS: 698.9 DDR: 490.5 |
SSR: 245.2 DSR: 490.5 TSR: 698.9 DDR: 490.5 |
CB200 Truss Performance Data
| Type No. | Internal Force | Structure Form | Not Reinforced Model | Reinforced Model |
|---|---|---|---|---|
| 200 | Standard Truss Moment (kN.m) | SS: 1034.3 DS: 2027.2 TS: 2978.8 QS: 3930.3 |
SSR: 2165.4 DSR: 4244.2 TSR: 6236.4 QSR: 8228.6 |
|
| 200 | Standard Truss Shear (kN) | SS: 222.1 DS: 435.3 TS: 639.6 QS: 843.9 |
SSR: 222.1 DSR: 435.3 TSR: 639.6 QSR: 843.9 |
Key Advantages
- Simple modular structure for easy assembly
- Convenient transportation and storage
- Rapid erection and disassembly capabilities
- Heavy loading capacity up to 6750 kN.m
- Exceptional stability and long fatigue life
- Versatile span and loading capacity alternatives
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Jiangsu Zhonghai Bridge Equipment Co.,LTD
Location
No. 83, Dantu New City Section, Speech Highway, Dantu District, Zhenjiang, Jiangsu, China
Contact Person
Lanny