Jiangsu Zhonghai Bridge Equipment Co.,LTD
                                                                                                           
Verified Supplier
12 Years
Since 2014
Menu

Galvanized Bailey Bridge with 1937.2 kN Shear Capacity and Rapid 3-4 Hour Assembly for Emergency Deployment

Price Negotiable
Price: USD 95-450
MOQ: 1 Pcs
Delivery Time: 8-10 work days
Brand: Zhonghai Bailey Bridge
Product Description
Rapid Deployment Bailey Bridge Solutions
Our galvanized Bailey bridges offer exceptional construction speed for emergency situations, with assembly times varying based on span length and complexity:
Construction Time Estimates
  • Short-span bridges (10m): 3-4 hours under ideal conditions
  • Medium-span bridges (20m): 6-8 hours typical construction time
  • Complex long-span bridges: Up to 5 days for extreme cases
Technical Specifications
CB200 Truss Performance Data
Model Structure Type Moment Capacity (kN.m) Shear Capacity (kN)
Standard Truss SS/DS/TS/QS 1034.3 - 3930.3 222.1 - 843.9
High Bending Truss 201 Series 1593.2 - 6054.3 348 - 1392
Super High Shear Truss 203 Series N/A 509.8 - 1937.2
CB200 Geometric Properties
Structure Type Chord Area (cm²) Section Properties (cm³) Moment of Inertia (cm⁴)
SS/SSR 25.48 - 50.96 5437 - 10875 580174 - 1160348
DS/DSR 50.96 - 101.92 10875 - 21750 1160348 - 2320696
TS/TSR 76.44 - 152.88 16312 - 32625 1740522 - 3481044
CB321(100) Performance Data
Model Structure Type Moment Capacity (kN.m) Shear Capacity (kN)
Standard Truss SS/DS/TS/DDR 788.2 - 3265.4 245.2 - 698.9
CB200 Bailey Bridge structural diagram showing truss configuration CB200 Bailey Bridge installation and assembly process CB200 Bailey Bridge geometric characteristics diagram CB200 Bailey Bridge completed installation view
Key Advantages
  • Simple modular structure for rapid assembly
  • Convenient transportation and easy disassembly
  • Heavy loading capacity up to 1937.2 kN shear
  • Exceptional stability and long fatigue life
  • Flexible span and loading capacity alternatives
  • Factory-prefabricated components for quality assurance
Completed Bailey Bridge installation showing full structure and traffic capacity

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiangsu Zhonghai Bridge Equipment Co.,LTD
Location No. 83, Dantu New City Section, Speech Highway, Dantu District, Zhenjiang, Jiangsu, China
Contact Person Lanny

Request A Quote

Please check your email address.
Your message must be at least 20 characters.