Qingdao Hongxingwang International Trade Co.,ltd
                                                                                                           
Verified Supplier
17 Years
Since 2009
Menu

80m Latex Mattress Production Line with 0.6m/min Conveyor Speed and 112 Mattress Capacity per 10 Hours

Price Negotiable
Price: Negotiable
MOQ: 1set
Delivery Time: 50 days
Brand: HONGXINGWANG
Product Description
Production Line Overview
This 80-meter latex mattress production line represents an advanced, scaled-up version of latex pillow manufacturing systems, designed for high-volume mattress production using the proven Dunlop process.
Production Process
Phase 1: Raw Material Preparation & Foaming
The process begins with precise formulation of natural and synthetic latex compounds, optimized for mattress durability and support characteristics.
  • Raw Material Mixing: Combination of natural/synthetic latex with vulcanizers, accelerators, and foaming agents
  • Enhanced Formulation: Higher solids content specifically designed for increased mattress density and longevity
  • Industrial Foaming: Large-capacity foaming machines ensure uniform, stable latex foam for consistent mattress quality
Phase 2: Injection Molding & Vulcanization
This critical phase utilizes specialized large-scale equipment designed specifically for mattress production.
  • Custom Mold Design: Large aluminum molds (200cm x 200cm+) capable of producing complete mattresses in single cycles
  • Advanced Ventilation: Thousands of precision needle protrusions create air pores for optimal ventilation and heat distribution
  • Brand Customization: Mold interiors can be engraved with logos, patterns, and zoned support designs
Technical Specifications
Parameter Specification
Total Conveyor Length 80 meters (40m x 2 sections)
Vulcanizing Chamber Length 28 meters
Injection Section Length 8 meters
Conveyor Speed 0.6 meters/minute
Vulcanizing Time 40 minutes
Drying Time Approximately 10 hours
Production Capacity
Output: 112 mattresses per 10-hour production cycle
  • Mold Injection Time: Approximately 2 minutes per mold
  • Foam Gel & Forming Time: Approximately 4 minutes

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Qingdao Hongxingwang International Trade Co.,ltd
Location Chengyang District, Qingdao, China
Contact Person Henry

Request A Quote

Please check your email address.
Your message must be at least 20 characters.