Qingdao Hongxingwang International Trade Co.,ltd
                                                                                                           
Verified Supplier
17 Years
Since 2009
Menu

120m Latex Mattress Production Line with 112pcs/10hr Capacity and 36m Vulcanization Chamber

Price Negotiable
Price: Negotiable
MOQ: 1set
Delivery Time: 50 days
Brand: HONGXINGWANG
Product Description
120m Latex Mattress Production Line Overview
This industrial-grade latex mattress production system features a 120-meter conveyor length with automated injection molding and precision vulcanization processes, delivering high-volume manufacturing capacity for premium latex mattresses.
Production Process Details
Injection Molding Phase
Foamed latex is injected into large molds through specialized pipes and injection ports. The injection process is optimized for speed and uniformity to ensure complete mold filling and consistent density throughout the mattress structure.
Vulcanization & Heat Curing
Molds enter a 36-meter vulcanization chamber with precise temperature control systems. This critical stage ensures uniform heating from surface to core, preventing internal decomposition and localized overheating that could compromise mattress quality and longevity.
Post-Processing Operations
  • Demolding: Requires coordinated manual effort using specialized tools to carefully remove finished mattresses without damage
  • Washing & Dehydration: Utilizes large-scale washing systems with multi-directional spray technology and industrial dehydrators for thorough cleaning and water extraction
  • Drying: Extended drying cycle in specialized tunnel dryers with precise humidity and temperature control to prevent mold and surface cracking
  • Technical Specifications
    Parameter Specification
    Total Conveyor Length 120 meters (60m x 2)
    Vulcanization Chamber 36 meters
    Injection Section 8 meters
    Vulcanization Time 45-55 minutes
    Conveyor Speed 0.6 meters/minute
    Drying Time Approximately 10 hours
    Mold Injection Cycle 2 minutes per mold
    Foam Gel Formation 4 minutes
    Production Capacity
    This automated production line delivers 112 premium latex mattresses per 10-hour operational cycle, providing exceptional manufacturing efficiency for high-volume production requirements.

    Get in Touch

    Have questions about our products or want to discuss a custom order? Our team is ready to help you.

    Company Qingdao Hongxingwang International Trade Co.,ltd
    Location Chengyang District, Qingdao, China
    Contact Person Henry

    Request A Quote

    Please check your email address.
    Your message must be at least 20 characters.