Steel Pallet Warehouse Rack Multi Level Mould Drawer Storage System - 750kg Capacity Per Layer, Customizable Industrial Shelving
Price:
USD$ 1.32-1.88/kilograms 100-9999 kilograms
MOQ:
20 Sets
Delivery Time:
1 month
Brand:
Peterack
Product Description
Product Overview
This steel pallet warehouse rack with multi-level mould drawer storage is specifically designed for organized storage of various mould types. The system features manual movable carriages on top for easy access and retrieval of goods.
Key Features
- Equipped with idler wheel rails on bottom for smooth operation
- Sliding shelf panels freely pull out during loading operations
- Middle type capacity: less than 750kg per level
- Heavy type capacity: more than 750kg per layer
- Section combination structure for easy transport and assembly
- Enhanced safety protection devices included
Technical Specifications
| Product Name | Storage Racking |
|---|---|
| Style | Mould Storage Rack |
| Brand | Peterack |
| Material | Steel |
| Color Options | Blue, white, orange, green, etc. |
| Origin | Jiangsu Province, China |
| Size | Customizable |
| Application | Widely used in heavy industries |
| Packing | Export Package |
Product Images
Frequently Asked Questions
Are you a factory or trading company?
We are a manufacturer with 15 years of experience specializing in warehouse racks and display stands.
Where is your factory located?
Our factory is located in Nanjing, Jiangsu Province.
What is your delivery time?
Typically within 20 days, depending on order quantity and shelf design requirements.
Could you produce according to customers' design?
Yes, we have extensive experience in customizing shelves to meet specific requirements.
Do you produce shelves with different kinds of materials?
Our products are primarily metal-based, but we also manufacture accessory shelves and displays using wood, titanium alloy, acrylic, glass, and other materials.
What is the difference between main rack and add-on rack?
Main racks feature 2 uprights as starting units, while add-on racks continue the system with only 1 upright. For example, a 10-wall rack installation would consist of 1 main rack plus 9 add-on racks.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Nanjing Peter Logistics Equipment Co., Ltd.
Location
Room 206, Bangning Science Park, No.2 Yuhua Street,Yuhuatai District,Nanjing,Jiangsu.
Contact Person
Fiona