ERBE ICC Series Foot Pedal Switch AMD-HE-PS6501-03-S - 3m Cable, 30,000+ Cycles, IPX8 Waterproof
Price:
USD 40-60/PCS
MOQ:
1
Delivery Time:
Negotiable
Brand:
Amydi-med
Product Description
Product Overview
Professional foot pedal switch designed for ERBE ICC series electrosurgical units including ICC350, ICC300, ICC200, ICC80, and ICC50 models. This lightweight, durable foot switch ensures reliable operation in hospital and clinical environments.
Performance Specifications
| Parameter | Specification |
|---|---|
| Mechanical Force Resistance | 1350N |
| Operational Life | Over 30,000 cycles |
| Working Resistance | ≤500MΩ (closed state) |
| Withstand Voltage Test | 1500V for 60 seconds (no flash breakdown) |
Technical Specifications
| Parameter | Value |
|---|---|
| Product Model | AMD-HE-PS6501-03-S |
| Compatible Brand | ERBE |
| Operation Type | Monopolar |
| Pedal Material | ABS |
| Cable Material | PVC |
| Cable Specification | 24AWG, 80°C, 300V, 4C X 0.2 mm² |
| Cable Length | 3m (black) |
| Connector | Round 4-pin (custom/OEM/ODM available) |
| Switching Voltage | Max 25VAC / 60VDC, Max 250 Vac |
| Switching Current | Max 0.5A / 5A / 10A |
| Switching Power | Max 30VA / 1250 VA |
| Waterproof Rating | IPX8 |
| Warranty Period | 12 months |
Product Images
Quality Assurance
- Rigorous quality control at every production stage
- Customer QC and third-party inspections accepted
- Mass production quality matches approval samples
- 12-month comprehensive warranty
Customization Options
- Custom logo printing available
- Custom mold development supported
- OEM and ODM services offered
- Neutral packaging or branded options
Frequently Asked Questions
What is your payment term?
T/T, L/C, Western Union, PayPal, Money Gram, Trade Assurance order, Secure Payment and so on.
Where is your Loading Port?
Shenzhen China
What is your Samples time?
1 day for existing samples, 3-7 days for custom samples.
What is your Mass Production time?
Normally 7-15 days after receiving payment.
How fast will you quote to clients?
Quotation provided within 24 hours after receiving your inquiry.
How long will you guarantee the mass quality?
3-12 months
Would you accept custom logo printing or custom mould?
All customization requests are welcome - contact us immediately.
How about shipping way after making order?
Air, Sea and Express shipping are all acceptable.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shenzhen Amydi-med Electrics Tech Co., Ltd.
Location
6 F , Bao Xing Long Industrial Zone, Shang Cun, Gongming,Guangming District, Shenzhen, China
Contact Person
Rita Peng