Foshan Nanhai Senhu Photoelectric Technology Co., Ltd.
                                                                                                           
Verified Supplier
13 Years
Since 2013
Menu

Split Solar Street Lamp Pole Splicing 3/4/5/6m For Outdoor Courtyard Landscape Road

Price Negotiable
Price: 20-36$
MOQ: 1 pcs
Delivery Time: 10-15 work days
Brand: Senhu
Product Description

Split street lamp pole solar street lamp home outdoor splicing lamp pole courtyard lamp pole landscape lamp road 3456 meters

This split-type street light pole features a modular design with a blue-white color scheme. Composed of a base section, middle section, and top equipment section, it serves as a stable mounting carrier for outdoor lighting and smart devices, suitable for various municipal and park lighting scenarios.
 

Product Details

  • Material: High-quality galvanized steel, corrosion-resistant and windproof, adaptable to complex outdoor environments.
  • Structure: Segmented design for easy transportation, installation and maintenance; the base is equipped with multiple mounting holes for secure fixation.
  • Craftsmanship: Professional spraying treatment, rust and oxidation resistant, with an attractive and durable appearance.

 

Functional Features

  • Customizable specifications to meet different height and equipment requirements.
  • Segmented structure enables convenient inspection, repair and upgrade, reducing maintenance costs.
  • Compatible with street lights, sensors, surveillance cameras and other devices, supporting intelligent expansion.
  •  

Application Scope

Outdoor lighting and intelligent construction scenarios such as urban roads, industrial parks, rural roads, and scenic areas.

 

 

Specification

Material Q235 high quality steel
Surface Anti-ultraviolet radiation plastic powder paint
Color optional Black, gray, white blue

 


 

 FAQ:
1.Q: Can you accept sample order?
A: Yes, sample order is acceptable.
2.Q: Are you a factory or trading company?
A: We're manufacturer and our factory is located in Foshan, China.
3.Q: What's the Lead Time?
A: Sample Needs 10 Days, Mass Production time is about 25 days.
4.Q: What's the Payment method?
A: By T/T, 30% in advance for deposit before production, the balance need to be paid before delivery.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Foshan Nanhai Senhu Photoelectric Technology Co., Ltd.
Location Tanbian Second lndustrial Zone,Shishan Town,Nanhai District Foshan City,Guangdong Province
Contact Person Jacky Yu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.