Three Phase Automated Powder Coating Line 3D Spraying Vertical Powder Coating Line
Price:
$20,000 to $50,000
MOQ:
1 set
Delivery Time:
50 days
Brand:
Hongshun
Product Description
Three Phase Automated Powder Coating Line with 3D Spraying Capability
Our automated powder coating line with 3D spraying technology is specifically designed for complex-shaped parts, ensuring uniform coating coverage on all surfaces through precise robotic positioning and movement.
Automated Powder Coating Line Overview
This advanced powder coating system features robotic 3D spraying capability that adjusts spray gun position and angle in three-dimensional space, providing complete coverage for complex geometries. Ideal for automotive engine covers and other intricate components requiring high-quality, uniform powder coating finishes.
Powder Coating System Components
The complete powder spraying system includes:
- Fully automatic recovery powder spraying cabinet
- Large cyclone recovery system
- Air supply center
- Automatic spraying reciprocating machine
- Manual spraying stations
- Secondary powder recovery system
- Automatic and manual powder spraying guns
Cyclone Quick Color Changing Spray Booth Features
- Large cyclone two-stage powder recovery system with high efficiency and cost reduction
- Advanced external hand-spraying platform for operator comfort and accessibility
- European technology cyclone with single separation rate exceeding 97%
- Blowback filter element recovery system - highly efficient and low noise
- Automatic recycling and powder screening system for pollution-free powder circulation
- Flap mechanism and pulse air flow automatic cleaning system for timely powder recovery
Automated Powder Coating Process Flow
Loading → Spray pre-degreasing and residue removal → Main degreasing (swimming + ultrasonic + heating cleaning) → Spray water washing (I) → Spray water washing (II) → Activation by swimming → Spray washing (3) → Spray washing (4) → Swimming type passivation → Spray washing (5) → Spray washing (6) → Pure water cleaning + adjustable automatic blow water → Water drop removal → Dehydration drying furnace → Natural cooling → Online roasting → Automatic powder coating in spray cabinet → Hurricane recovery powder supply center → Secondary recovery system → Grinding cabinet → Curing oven drying → Natural cooling → QC inspection → Unloading → Packaging
Pretreatment Process Timing
| Process | Time | Process | Time |
|---|---|---|---|
| Spray pre-oil removal | 1.5 min | Swimming type main activated | 4-5 min |
| Swimming type main oil removal | 4-5 min | Spray washing 3 | 1.5 min |
| Spray washing 1 | 1.5 min | Spray washing 4 | 1.5 min |
| Spray washing 2 | 1.5 min | Swimming type passivation | 4-5 min |
| Spray washing 5 | 1.5 min | Spray washing 6 | 1.5 min |
| Pure water wash | 1.5 min |
Production Line Design
The overall layout design prioritizes process rationality, equipment coordination, operational convenience, maintenance accessibility, and aesthetic appeal for optimal production efficiency.
Customer Applications
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Dongguan Hongshun Automation Equipment Co., Ltd.
Location
Building 1, No. 13, Sanheng Road, Lianhu South, Tangxia Town, Dongguan City
Contact Person
Jesse Tang