Easy Operation Electrostatic Powder Coating Line AC220V With Remote Monitoring
Price:
$20,000 to $50,000
MOQ:
1 set
Delivery Time:
50 days
Brand:
Hongshun
Product Description
Automated Powder Coating Line with Remote Monitoring
Our Automated Powder Coating Line with remote monitoring provides convenient operation and real-time performance tracking. The built-in monitoring system enables operators to monitor line performance from any location using mobile devices or computers. The modular design ensures straightforward installation and maintenance, making it ideal for multi-site operations and remote production optimization. Suitable for coating diverse products including metal tanks and plastic components.
Powder Supply Center Specifications
Dimensions: L1200 × D650 × H2050
Main Components
- Vibration table powder supply device
- Powder automatic recovery system
- Spray gun and pneumatic cleaning system of recovery pipeline
- Speed reducer
The powder supply center is engineered for rapid color change operations, replacing traditional powder supply buckets. External integrated powder pump groups facilitate easier cleaning. Powder is poured into the fluidized powder tank and transported via integrated powder pumps to supply the spray guns.
Equipped with an efficient vibrating screen (60 mesh), the system screens recovered powder to separate contaminants and large particles, ensuring only clean powder enters the supply center. As an integral component of the quick color change system, the powder supply center directly impacts final product spray quality and serves as the core of automated production.
Automated Powder Coating Process Flow
Loading → Spray pre-degreasing and residue removal → Main degreasing (swimming + ultrasonic + heating cleaning) → Spray water washing (I) → Spray water washing (II) → Activation by swimming → Spray washing (3) → Spray washing (4), swim lay type passivation, spray washing (5) → Spray washing (6) → Pure water cleaning + adjustable automatic blow water, water drainage, dehydration drying furnace, natural cooling, online roast → Under belt anti-pull installation baked → PP board automatic coating powder spraying cabinet → Hurricane recovery powder supply center → Secondary recovery system → Grinding cabinet → Curing oven drying → Natural cooling → QC inspection → Unloading → Packaging
Pretreatment Process Timing
| Process | Time | Process | Time |
|---|---|---|---|
| Spray pre-oil removal | 1.5 min | The swimming style main activated | 4-5 min |
| Swimming type main oil removal | 4-5 min | Spray washing 3 | 1.5 min |
| Spray washing 1 | 1.5 min | Spray washing 4 | 1.5 min |
| Spray washing 2 | 1.5 min | Swimming type passivation | 4-5 min |
| Spray washing 5 | 1.5 min | Spray washing 6 | 1.5 min |
| Pure water wash | 1.5 min |
Application Gallery
Our solutions are designed to meet all technical requirements while minimizing investment and reducing production energy consumption, ultimately lowering overall production costs for our customers.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Dongguan Hongshun Automation Equipment Co., Ltd.
Location
Building 1, No. 13, Sanheng Road, Lianhu South, Tangxia Town, Dongguan City
Contact Person
Jesse Tang